CertBus New Updated TB0-107 Exam Dumps Free Download

Do not worry about that if you are stuck in the TB0-107 exam difficulties, CertBus will assist you all your way through the TB0-107 Tibco BusinessWorks 5 Exam exam with the most update TB0-107 PDF and VCE dumps. CertBus exam TB0-107 preparation materials are the most comprehensive material, covering every key knowledge of TB0-107 Tibco BusinessWorks 5 Exam exam.

We CertBus has our own expert team. They selected and published the latest TB0-107 preparation materials from Tibco Official Exam-Center: http://www.certgod.com/TB0-107.html

QUESTION NO:70

A GUI Editor for editing XML documents is being built. It has a view where the XML document

can be presented in a tree form. One of the requirements is that a user should be able to visually

select one or more nodes, and cut and paste them into another destination node. A parser that

conforms to the DOM API implementation is used for XML processing. Which of the following

types provided by the DOM API can be BEST used to temporarily store the nodes that have been

cut and later to append them to the destination node?

A. Document

B. DocumentFragment

C. NodeList

D. NodeMap

Answer: B

QUESTION NO: 21

A buyer sends details of an order in the form of a flat file. A developer needs to create a service

that will read this flat file and, based on its contents, transform it into XML to create an order in the

IBM Sterling Selling and Fulfillment Suite. Which nodes does the developer need to create for this

service?

A. FTP, Text Translator, and API

B. File I/O, XSL Translator, and DB

C. File I/O, Text Translator, XSL Translator, and API

D. File I/O, Text Translator, XSL Translator, API, and DB

Answer: C

Explanation:

QUESTION NO:158

In the process of developing a hybrid application, the QA team finds a bug with the user interface that is

noticeable only on an iOS device. What can the developer use to debug the application?

A. Use the Xcode debugger console.

B. Use the Mobile Browser Simulator.

C.

Use iWebInspector and/or Weinre.

D. Use WL.Logger.debug() and WL.Logger.error().

Correct Answer: C

QUESTION NO: 23

An administrator uses DLPAR on an active LPAR to add an additional VLAN ID into an existing virtual

adapter used by the SEA. The operation fails with error HSC01221 stating that the Modification of Virtual I/

O resources failed. The server being modified is a POWER6 595 running firmware version EH350_071.

The VIO Server is at version 2.2.0.10 FP24Based on this information, what is the most likely cause for this

error?

A. The system firmware needs to be updated to EH350_085.

B. The VIO Server needs to be updated to 2.2.0.10 FP 24 SP1.

C. Dynamic addition of VLAN IDs to an existing virtual adapter are only supported at AIX 7.1.

D. Dynamic addition of VLAN IDs to an existing virtual adapter are only supported on POWER7 hardware.

Correct Answer: B

QUESTION NO:115

A storage specialist needs to create a new host connection using the DSCLI. Which of the following

parameters identifies the host?

A. hosttype

B. volume group

C. ioports

D. WWPN

Correct Answer: D