Do not worry about that if you are stuck in the 310-036 exam difficulties, CertBus will assist you all your way through the 310-036 SUN Certified JAVA 2 PROGRAMMER 1.4 UPGRADE exam with the most update 310-036 PDF and VCE dumps. CertBus exam 310-036 preparation materials are the most comprehensive material, covering every key knowledge of 310-036 SUN Certified JAVA 2 PROGRAMMER 1.4 UPGRADE exam.
We CertBus has our own expert team. They selected and published the latest 310-036 preparation materials from SUN Official Exam-Center: http://www.certgod.com/310-036.html
QUESTION NO:45
Consider the following XML:
Click here to apply
If using a SAX parser, the following events will occur in what order?
1. Start element – Name: paragraph
2. End element- Name: paragraph
3. Start element – Name: link
4. End element- Name: link
5. Characters: Click
6. Characters: here
7. Characters: to apply
8. End characters
A. 1, 5, 7, 3, 6, 4, 2
B. 1, 5, 3, 6, 4, 7.2
C. 1, 5, 8, 3, 6, 8, 4, 7, 8, 2
D. 1, 5, 6, 7, 3, 4, 2
Answer: B
QUESTION NO:8
An administrator has been asked to update an IBM i 7.1 system to the most current Technology Refresh available from IBM. Which method is the most appropriate to achieve the update?
A. Perform a D-mode IPL using the Technology Group PTF package SF99707.
B. Perform a slip install using the most current 1_Base_01 resave media available.
C. Perform a scratch install using the most current 1_Base_01 resave media available.
D. Perform an install of the Technology Group PTF package SF99707 using the GO PTF menu.
Correct Answer: D
QUESTION NO:59
Which IBM host-based device driver allows for path failover, while also providing dynamic load balancing
on a Windows 2000-based server?
A. PowerPath
B. MPIO
C.
RDAC
D. SDD
Correct Answer: D
QUESTION NO: : 111
How are soft and hard thread limitations configured using the pdadmin command line for a
given junction?
A. server task webseald-internet_01 create -t tcp -h lpnl001 -l 70,90 /web
B. server task webseald-internet_01 create -p tcp -h lpnl001 -t 70,90 /web
C. server task webseald-internet_01 create -t tcp -h lpnl001 -l 70 -L 90 /web
D. server task webseald-internet_01 create -p tcp -h lpnl001 -t 70 -T 90 /web
Answer: C
Explanation:
QUESTION NO:90
A bank has requested proposals for a storage solution to upgrade their disaster recovery processes for
their IBM System z, UNIX, and Microsoft Windows environment. The solution must simulate a multi-site
environment and provide the customer the ability to evaluate Metro Mirror, Global Mirror, Global Mirror for
z/OS, and FlashCopy. 120 TB physical capacity is required per site. Only Fibre Channel drives can be
used. Which solution best meets the specified requirements?
A. two DS8700 systems with two-way processor cards and 600 GB FC drives
B. two DS8700 systems with four-way processor cards and LPAR
C. two DS8700 systems with two-way processor cards and two frames per system
D. two DS8700 systems with four-way processor cards and two frames per system
Correct Answer: D