Which certification is the most popular and worthy to get? No doubt the SAP Application Associate C_TSCM42_65 SAP Certified Application Associate – Production – Planning and Manufacturing with SAP ERP 6.0 EHP5 exam is a worth challenging task but you should take among all the IT certifications . CertBus is providing the latest version of SAP Application Associate C_TSCM42_65 PDF and VCE dumps now. Comprehensive understanding on C_TSCM42_65 SAP Certified Application Associate – Production – Planning and Manufacturing with SAP ERP 6.0 EHP5 exam syllabus through CertBus 100% pass guarantee of the success on your SAP Application Associate C_TSCM42_65 SAP Certified Application Associate – Production – Planning and Manufacturing with SAP ERP 6.0 EHP5 exam taking.
We CertBus has our own expert team. They selected and published the latest C_TSCM42_65 preparation materials from SAP Official Exam-Center: http://www.certgod.com/C_TSCM42_65.html
QUESTION NO:2
Which of the following statements about consumption are correct? (Choose two)
A. Consumption takes place on the material level between the planned independent requirements
and the planned orders.
B. Consumption parameters (consumption mode and consumption interval) can be set in the
material master or in the MRP group.
C. Consumption is restructured with the planning run.
D. Consumption can take place between order reservations and planned independent
requirements, depending on the strategy.
Answer: B,D
QUESTION NO:5
What does SAP ERP mean?
A. SAP ERP is a planning system in which extended planning processes can be mapped.
B. SAP ERP is a system hardware that includes modules for purchasing, sales and distribution,
materials management, production and so on.
C. SAP ERP is a technological platform, on the basis of which customer-specific extensions can
be imported.
D. SAP ERP is an application that an enterprise can use to manage its business processes
efficiently.
Answer: D
QUESTION NO:6
Which functions can be triggered before releasing a production order? (Choose three)
A. Confirmation
3
B. Selection of a routing
C. Scheduling
D. Stock determination
E. Selection of a BOM
Answer: B,C,E
QUESTION NO:4
When analyzing the SAP ECC order report for a planned order for a finished product, you discover
that one of the assemblies will not be available in time for the scheduled final assembly because of
automatic forward scheduling.
Which planning procedure do you use to create a feasible production plan from a requirements
planning perspective?
A. Interactive single-item planning for the delayed assembly
B. Multi-level single-item planning with the “simulation mode” option
C. Total planning online
D. Multi-level single-item planning with the “display material list” option
Answer: B
QUESTION NO:13
When modeling in-house production using SAP ECC, on which business levels can you create a
bill of material (BOM)? (Choose two)
A. At the client level
B. At the plant level
C. At the company code level
D. At the business area level
Answer: A,B
6
QUESTION NO:12
For which of the following objects can you enter a confirmation? (Choose two)
A. Production order
B. Production order operation
C. Trigger Point
D. Work Center
Answer: A,B
QUESTION NO:3
Where can you define the valid receivers for production order costs?
A. In the valuation variant
B. In the production scheduling profile
C. In the settlement profile
D. In the costing variant
Answer: C
2
QUESTION NO:11
In SAP ECC, you calculate the standard available capacity for a work center capacity using the
following data:
– Start: 7:00:00 a.m.
– End: 3:00:00 p.m.
5
– Break duration: 1 hour
– Rate of utilization: 80%
– Overload: 110%
– Number of individual capacities: 1
How large is the standard available capacity?
A. 7 hours
B. 6.16 hours
C. 5.6 hours
D. 8 hours
Answer: C
QUESTION NO:10
In what sequence are the steps of material requirements planning performed in SAP ECC?
A. 1. Net requirements calculation
2. Lot sizing
3. Scheduling
4. Determination of the procurement type
B. 1. Calculation of safety stock
2. Lot sizing
3. Scheduling
4. Determination of the procurement type
C. 1. Net requirements calculation
2. Lot sizing
3. Determination of the procurement type
4. Scheduling
D. 1. Availability check
2. Lot sizing
3. Determination of the procurement type
4. Scheduling
Answer: C
QUESTION NO:1
What features related to process orders can be used to fulfill Good Manufacturing Practices
(GMP) requirements? (Choose three)
A. Availability check
B. Digital signature
C. Resource selection
D. Electronic batch record
E. Approved master recipes
Answer: B,D,E
CertBus exam braindumps are pass guaranteed. We guarantee your pass for the C_TSCM42_65 exam successfully with our SAP materials. CertBus SAP Certified Application Associate – Production – Planning and Manufacturing with SAP ERP 6.0 EHP5 exam PDF and VCE are the latest and most accurate. We have the best SAP in our team to make sure CertBus SAP Certified Application Associate – Production – Planning and Manufacturing with SAP ERP 6.0 EHP5 exam questions and answers are the most valid. CertBus exam SAP Certified Application Associate – Production – Planning and Manufacturing with SAP ERP 6.0 EHP5 exam dumps will help you to be the SAP specialist, clear your C_TSCM42_65 exam and get the final success.
C_TSCM42_65 Latest questions and answers on Google Drive(100% Free Download): https://drive.google.com/file/d/0B_3QX8HGRR1mTDllMEw3S3dTYk0/view?usp=sharing
C_TSCM42_65 SAP exam dumps (100% Pass Guaranteed) from CertBus: http://www.certgod.com/C_TSCM42_65.html [100% Exam Pass Guaranteed]
Why select/choose CertBus?
Millions of interested professionals can touch the destination of success in exams by certgod.com. products which would be available, affordable, updated and of really best quality to overcome the difficulties of any course outlines. Questions and Answers material is updated in highly outclass manner on regular basis and material is released periodically and is available in testing centers with whom we are maintaining our relationship to get latest material.