CertBus ensures to provide the most update 199-01 Riverbed Certified Solutions Professional exam questions with the most accurate answers. CertBus 199-01 are the most complete and authoritative exam preparation materials with which one can pass the 199-01 exam in an easy way. Preparing for Riverstone 199-01 Riverbed Certified Solutions Professional exam is really a tough task to accomplish. But CertBus will simplified the process.
We CertBus has our own expert team. They selected and published the latest 199-01 preparation materials from Riverstone Official Exam-Center: http://www.certgod.com/199-01.html
QUESTION NO:90
A bank has requested proposals for a storage solution to upgrade their disaster recovery processes for
their IBM System z, UNIX, and Microsoft Windows environment. The solution must simulate a multi-site
environment and provide the customer the ability to evaluate Metro Mirror, Global Mirror, Global Mirror for
z/OS, and FlashCopy. 120 TB physical capacity is required per site. Only Fibre Channel drives can be
used. Which solution best meets the specified requirements?
A. two DS8700 systems with two-way processor cards and 600 GB FC drives
B. two DS8700 systems with four-way processor cards and LPAR
C. two DS8700 systems with two-way processor cards and two frames per system
D. two DS8700 systems with four-way processor cards and two frames per system
Correct Answer: D
QUESTION NO: 160
A P0WER7 system has been recently installed and 4 uncapped shared processor LPARs have been
defined.
The use of Multiple Shared Processor Pools has been decided upon for licensing and performance
reasons.
When adding PROD1 to the Production pool via the command line, the following error is given “This
operation is not allowed because the partition is using dedicated processors”
Why is this error being received?
A. P0WER6 mode is enabled
B. LPAR has not been powered on
C. LPAR has been powered on
D. The Pool has insufficient processor units
Correct Answer: B
QUESTION NO:33
Your job will write its output to a fixed length data file. When configuring the sequential file stage
as a target what format and column tab properties need to be considered for this type of file
output?
A. On the Output Link format tab, change the \’Delimiter\’ property to whitespace.
B. On the Output Link format tab, add the \’Record Type\’ property to the tree and set its value to be
\’F\’.
C. On the Output Link column tab, insure that all the defined column data types are fixed length
types.
D. On the Output Link column tab, specify the record size total based on all of the columns defined
Answer: C
Explanation:
QUESTION NO:110
A customer is planning a combined solution of a 2 node SVC and DS8700 with 128×300 GB FC disks.
During the TDA the reviewer compares the machine configuration with the customer\’s expectations. Which
of the following customer requirements must be considered?
A. the number of SAN ports required by the solution
B. thin provisioning is mandatory
C. the solution needs to support RAID 0
D. the solution needs to be supported by the VMware Site Recovery Manager
Correct Answer: A
QUESTION NO: 4
A customer places an order of amount $100. As per their business rules, if the payment method is
credit card the retailer has to authorize the credit card by contacting the payment gateway for the
complete order amount before the order can be scheduled. Which execution step needs to be
completed for the payments on the order to be authorized and the details stored against the
order?
A. The managePaymentTerms API needs to be invoked with the appropriate order and payment
information in the input.
B. The executePaymentTransactions API needs to be invoked with the appropriate order and
payment information in the input.
C. The Payment Collection, Payment Execution and Payment Collection transactions should be
executed in that sequence for the order.
D. The payment status on the order has to be manually changed to UTHORIZED?from the
Sterling Selling and Fulfillment Foundation console.
Answer: C
Explanation: