Oracle 1Z0-466 Study GUide and Practice Exams, Test Engine and PDF Q and As

Do not worry about that if you are stuck in the 1Z0-466 exam difficulties, CertBus will assist you all your way through the 1Z0-466 Project Lifecycle Management Essentials exam with the most update 1Z0-466 PDF and VCE dumps. CertBus exam 1Z0-466 preparation materials are the most comprehensive material, covering every key knowledge of 1Z0-466 Project Lifecycle Management Essentials exam.

We CertBus has our own expert team. They selected and published the latest 1Z0-466 preparation materials from Oracle Official Exam-Center: http://www.certgod.com/1Z0-466.html

QUESTION NO:59

Which IBM host-based device driver allows for path failover, while also providing dynamic load balancing

on a Windows 2000-based server?

A. PowerPath

B. MPIO

C.

RDAC

D. SDD

Correct Answer: D

QUESTION NO:107

Which information is required to get the feature activation codes?

A. machine serial number, model, and machine signature

B. model, disk size, and machine serial number

C. model, Storage Managerversion, and machine signature

D. model, WWNN, and machine serial number

Correct Answer: A

QUESTION NO: 70

A customer is planning to migrate an existing AIX 7 environment from POWER5 hardware to POWER7.

The existing deployment consists of multiple machines, each hosting many LPARs. Due to software

licensing constraints, the new environment must maintain the same number of logical CPUs. The pmcycles

command reports the following on an LPAR on the POWER5 environment:

$ pmcycles -m

CPU 0 runs at 2198 MHz

CPU 1 runs at 2198 MHz

CPU 2 runs at 2198 MHz

CPU 3 runs at 2198 MHz

CPU 4 runs at 2198 MHz

CPU 5 runs at 2198 MHz

CPU 6 runs at 2198 MHz

CPU 7 runs at 2198 MHz

How many virtual CPUs should be assigned to the destination LPAR on the POWER7 environment?

A. 1

B. 2

C. 4

D. 8

Correct Answer: B

QUESTION NO:141

A developer writes a Worklight push notification application and creates the following: 1.An event source

2.An adapter to retrieve the notification from the event source 3.A function to notify the user device 4.A

function to handle the arriving notification Which two actions still need to be done? (Choose two.)

A. Deploy the adapter to the server.

B. Deploy the event source to the server.

C.

Create a function to verify the user device.

D. Create a function to subscribe to the event source.

E. Register the event source for the device on the console.

Correct Answer: AD

QUESTION NO:158

A new sales user attempts to sign on to the system. The user is immediately signed oft. The users job log

contains the message CPE981 0: Library SALESLIB not found.

All sales applications are located in the ASP named SALES.

Which parameter should the administrator set in the user profile to correct this error?

A. JOBD

B. GRPPRE

C. INLIBL

D. INLASPGRP

Correct Answer: A