[PDF and VCE] Free CertBus Microsoft MB6-821 PDF Real Exam Questions and Answers Free Download

CertBus ensures to provide the most update MB6-821 AX 2009 MorphX Solution Development exam questions with the most accurate answers. CertBus MB6-821 are the most complete and authoritative exam preparation materials with which one can pass the MB6-821 exam in an easy way. Preparing for Microsoft MB6-821 AX 2009 MorphX Solution Development exam is really a tough task to accomplish. But CertBus will simplified the process.

We CertBus has our own expert team. They selected and published the latest MB6-821 preparation materials from Microsoft Official Exam-Center: http://www.certgod.com/MB6-821.html

QUESTION NO:26

A customer with a small IT budget has one data center. Their main application is a database running on an

IBM System Storage DS8000. The database has a data change rate of 50% per day. Once a week, they

must do a point-in-time backup from the database to tape. The time it takes to run the backup now exceeds

the backup window allowed. The customer requests a proposal to reduce database downtime

caused by running backups, with nearly zero impact to production volumes. In addition to the tape backup,

which DS8000 feature should a technical specialist propose?

A. FlashCopy

B. FlashCopy SE

C. Metro Mirror

D. Global Mirror

Correct Answer: A

QUESTION NO:27

An administrator issues the WRKSYSACT command on a system partition using dedicated processors and the following result displays:

Current processing capacity 2

What does the current processing capacity value indicate?

A. The percentage of CPU currently available for system jobs.

B. The share of the physical processors in the pool it is running.

C. The number of processing units currently assigned to the partition.

D. The number of virtual processors that are currently active in the partition.

Correct Answer: C

QUESTION NO: 74

An architect has been given the task of incorporating some new Power Systems servers running AIX 7 into

an existing data center which is supported by a legacy SAN.

The new servers will need to be connected to the SAN, and the LPARs on the servers will each have

access to a Fibre Channel Tape using virtualized devices.

Which action will the architect need to take?

A. Check that the SAN switches support NPIV.

B. Use the legacy Fibre Channel device driver in AIX.

C. Specify that AIX Enterprise Edition must be used.

D. Put the tape drive into the same zone as the HBA in the VIOS.

Correct Answer: A

QUESTION NO:53

Which special authority is required to install PTF5 on a system with the QSECURITY system value set to 40?

A. *ALLOBJ

B. *JOBCTL

C. *SECADM

D. *IOSYSCFG

Correct Answer: A QUESTION NO:70

An administrator has been provided with a POWERS system for a disaster recovery test. The Licensed

Internal Code has been loaded and the disks initialized.

The recovery of IBM i 7.1, which had originally been saved on a Power 720, failed.

Which action will resolve the problem?

A. Use a D-Mode IPL to install the operating system.

B. Restart the recovery specifying the Target Release parameter as 7.1.

C. Install the operating system with the *PREV option and specify POWERS as the system to restore to.

D. Slip-install the LIC from the source system backup, and then continue with the remainder of the install.

Correct Answer: D