[Newest Version] Easily Pass 70-573-VB Exam with CertBus Updated Real Microsoft 70-573-VB Exam Materials

There is no need to worry when you are suffering the difficult time in the 70-573-VB exam preparation, CertBus will assist you to pass the 70-573-VB exam with latest update 70-573-VB TS: Microsoft SharePoint 2010, Application Development PDF and VCE dumps. CertBus has the most comprehensive Microsoft exam preparation materials, covering each and every aspect of 70-573-VB TS: Microsoft SharePoint 2010, Application Development exam curriculum. We ensure you 100% success in 70-573-VB exam.

We CertBus has our own expert team. They selected and published the latest 70-573-VB preparation materials from Microsoft Official Exam-Center: http://www.certgod.com/70-573-VB.html

QUESTION NO:115

An administrator is connecting to the HMC for IBM i console access using IBM i Access Using port 2300. What is the required user ID in “Connection Properties”?

A. Q#HMC

B. hscroot

C. QSECOFR

D. QCONSOLE

Correct Answer: A

QUESTION NO:24

After an abnormal IPL, jobs that are accessing some files for the first time are spending an extended amount of time in a status of “IDX” and are taking longer to complete.

Which command should be used to enable all pending access path rebuilds to be analyzed, prioritized, and immediately executed rather than waiting for first access?

A. WRKEFD

B. EDTRBDAP

C. WRKAPSTS

D. WRKJOBAP

Correct Answer: B

QUESTION NO:145

How does Worklight handle globalization of application messages?

A. It uses a user-provided JavaScript file.

B. It uses language-specific XML resources.

C.

It uses a system-provided globalization file.

D.

It uses a native language translation library.

Correct Answer: A

QUESTION NO: 202

The Server Resource Usage report in Common Reporting for IBM Tivoli Storage Manager V6.2

(TSM) displays which three bar charts? (Choose three.)

A. Log Size

B. CPU Usage

C. Tape Usage

D. Database Size

E. Storage Pool Space

F. Percent Memory Allocated for TSM

Answer: C,D,E

QUESTION NO:36

A client has an existing Logical Partition (LPAR) on a p650 running AIX 5.2 and will be porting

this LPAR to a p5 590. A mksysb has been run to tape, and a compatible tape drive is available

and allocated to the target LPAR on the p5 590. What additional resource needs to be available

on the p5 590?

A. A CD or DVD with installation media

B. An internal SCSI adapter in the target LPAR

C. An Ethernet adapter for access to an FTP server

D. Advanced Power Virtualization feature of the p5 590

Answer: A