One of my colleague recommend me that CertBus MB3-637 dumps are effective and helpful. Thank goodness I followed up with him and choose CertBus as my assistance on my MB3-637 GP 10.0 Manufacturing Applications certification exam! I passed my Microsoft MB3-637 exam very easily. I was lucky, all my questions in the exams were from my Microsoft MB3-637 dumps.
We CertBus has our own expert team. They selected and published the latest MB3-637 preparation materials from Microsoft Official Exam-Center: http://www.certgod.com/MB3-637.html
QUESTION NO: 100
Non-IBM supported Web server (start, stop and change configuration) must be managed from the
WebSphere Application Server V6 administrative console in a Network Deployment environment.
Which of the following processes has to be started on the WebServer machine that has been
configured as a managed node?
A. Deployment manager
B. Custom profile
C. Node agent
D. Application server
Answer: C
QUESTION NO:67
A customer would like to implement an IBM System Storage DS8000 solution. A Capacity Magic study has
determined that 500 drives of 450 GB are required to meet the customer\’s capacity requirements. Limited
space is available for additional systems in the data center. Which solution best meets the customer\’s
requirements?
A. DS8800 system with three frames
B. DS8800 system with one frame
ExamReal.com — 100% Real QandAs | 100% Real Pass
C.
DS8700 system with two frames
D.
DS8800 system with two frames
Correct Answer: D
QUESTION NO:86
A mainframe customer would like to receive a proposal for a mainframe storage system with 120 TB raw
capacity. The mainframe server load is not too high, and they need hard disk drives with the lowest
possible power consumption to keep operating costs low. The customer will not increase the capacity of
their mainframe applications in the future but rather invest later into their System p servers. Which of the
following solutions best meets these requirements at the lowest cost?
A. offer a DS8700 system with 600 GB FC drives
B. offer a DS8800 system with standard cabling and 600 GB SAS drives
C. offer a DS8800 system with business class cabling and 600 GB SAS drives
D. offer a DS8800 system with SATA drives
Correct Answer: C
QUESTION NO:51
A company is receiving digitally signed SOAP/HTTPS messages to process payment transactions from its
business partner and verifies those messages using the Verify action. There is also a requirement to use
the signing certificate sent by the partner to encrypt the confidential response message from the company
back to the partner. To satisfy this requirement, the solution implementer creates an Encrypt action with
the \’Use Dynamically Configured Recipient Certificate\’ parameter to \’on\’. Which statement related to the
scenario above is false?
A. The certificate created in the \’Recipient Certificate\’ field takes precedence over the dynamic certificate
input option.
B. The encrypt action will use the certificate defined in the variable var://context/transaction/encryptingcert
to encrypt the message.
C. The dynamic certificate used to encrypt the outgoing message can be user-defined using the syntax
\’name:CertificateObjectName\’
D. The public certificate used to encrypt the outgoing message will be automatically extracted from the
incoming signed message while the signature is verified in the Verify action.
Correct Answer: A
QUESTION NO: 90
When the HTTP plug-in configuration file is regenerated either manually or automatically the file
must be propagated to the Web servers. If a system administrator needs to configure automatic
propagation of the plugin-cfg.xml file for an Apache HTTP server, which of the following tasks
must be performed?
A. Enable session management for the HTTP server
B. Configure the HTTP server on a managed node.
C. Automatic propagation is not supported, the plugin-cfg.xml file must be transferred manually
D. Set the automatic propagation flag in the pluin-cfg.xml file.
Answer: B