CertBus ensures to provide the most update 70-410 Installing and Configuring Windows Server 2012 exam questions with the most accurate answers. CertBus 70-410 are the most complete and authoritative exam preparation materials with which one can pass the 70-410 exam in an easy way. Preparing for Microsoft 70-410 Installing and Configuring Windows Server 2012 exam is really a tough task to accomplish. But CertBus will simplified the process.

We CertBus has our own expert team. They selected and published the latest 70-410 preparation materials from Microsoft Official Exam-Center: http://www.certgod.com/70-410.html

QUESTION NO:24

A BPM application developer is creating a General System Service that calls an Integration

Service. The General System Service must handle exceptions coming from the integration

service. How should the BPM application developer implement error handling?

A. Error End Event

B. Error Intermediate Event

C. Throw Statement(s)

D. Try/Catch Statement(s)

Answer: B

QUESTION NO:51

After rebooting the machine, Companycom notices that the machine is not performing as well as

before. The applications are running slower, and their CPU utilization has increased. How can the

customer check to see if a CPU was deallocated?

A. Run the vmstat command

B. Run the iostat command

C. Run the lparstat command

D. Check the logs in the /var/adm/ras directory

Answer: C

QUESTION NO:24

A BPM application developer is creating a General System Service that calls an Integration Service. The

General System Service must handle exceptions coming from the integration service. How should the BPM

application developer implement error handling?

A. Error End Event

B. Error Intermediate Event

C. Throw Statement(s)

D. Try/Catch Statement(s)

Correct Answer: B

QUESTION NO: 51

A company is receiving digitally signed SOAP/HTTPS messages to process payment transactions

from its business partner and verifies those messages using the Verify action. There is also a

requirement to use the signing certificate sent by the partner to encrypt the confidential response

message from the company back to the partner. To satisfy this requirement, the solution

implementer creates an Encrypt action with the \’Use Dynamically Configured Recipient Certificate\’

parameter to \’on\’. Which statement related to the scenario above is false?

A. The certificate created in the \’Recipient Certificate\’ field takes precedence over the dynamic

certificate input option.

B. The encrypt action will use the certificate defined in the variable

var://context/transaction/encrypting-cert to encrypt the message.

C. The dynamic certificate used to encrypt the outgoing message can be user-defined using the

syntax \’name:CertificateObjectName\’

D. The public certificate used to encrypt the outgoing message will be automatically extracted from

the incoming signed message while thesignature is verified in the Verify action.

Answer: A

Explanation:

QUESTION NO:59

The network requirements for an appliance state that there should be an internal network used for

the management Ethernet interface and all other Ethernet interfaces will use the same external

network. With these requirements in mind, how can the solution implementer configure the

Ethernet Interfaces to ensure only the specified internal network uses the management interface

and all other outgoing traffic uses one of the other interfaces?

A. Develop a style sheet for content based routing that uses host header.

B. Define Secondary Addresses for the internal network on all interfaces.

C. Define Default Gateways on all interfaces with TCP Window Scaling enabled.

D. Define Static Route for internal network on the management interface and configure the Default

Gateway on all other interfaces.

Answer: D

Explanation: