How to pass 70-554-CSHARP exam easily with less time? CertBus provides the most valid 70-554-CSHARP exam preparation material to boost your success rate in Microsoft 70-554-CSHARP UPGRADE:MCSD MS.NET Skills to MCPD Entpse App Dvlpr Pt2 exam. If you are one of the successful candidates with CertBus 70-554-CSHARP PDF and VCEs, do not hesitate to share your reviews on our Microsoft materials.
We CertBus has our own expert team. They selected and published the latest 70-554-CSHARP preparation materials from Microsoft Official Exam-Center: http://www.certgod.com/70-554-Csharp.html
QUESTION NO: 206
In a large IBM Tivoli Storage Manager V6.2 environment there are many nodes with many
filespaces. Some of them should be exported to a remote system for disaster protection. The
names of the filespaces contain many special characters. What is the best way to resolve this
task?
A. Export all nodes data with a genericfilespace value.
B. Export / import node data server to server with thefsid= option.
C. Export / import node data server to server with all data from a specific node.
D. Restore nodes data to a work area and perform a backup to the remote system.
Answer: B
QUESTION NO:55
Companycom is considering a partitioned solution with one of the LPARs utilizing 12 CPUs.
Multiple applications will be loaded on this large LPAR. However, the customer wants to ensure
some tasks will have higher priority access to the CPU and memory resources. Which of the
following solutions would best satisfy the requirement?
A. Loadleveler
B. AIX Workload Manager
C. Partition Load Manager
D. Tivoli Provisioning Manager
Answer: B
QUESTION NO: 45
An administrator has installed a Linux LPAR using virtual storage and virtual networking on a POWER7
system and is attempting to DLPAR additional memory into the LPAR. They see the following error
message during the DLPAR operation.
Which action will resolve this issue?
A. Add the HMC to the /etc/hosts file.
B. Configure a network on the same subnet on the HMC.
C. Install the IBM Installation Toolkit for Linux
D. Upgrade the version on Linux to support memory DLPAR.
Correct Answer: C
QUESTION NO:67
A customer would like to implement an IBM System Storage DS8000 solution. A Capacity Magic study has
determined that 500 drives of 450 GB are required to meet the customer\’s capacity requirements. Limited
space is available for additional systems in the data center. Which solution best meets the customer\’s
requirements?
A. DS8800 system with three frames
B. DS8800 system with one frame
ExamReal.com — 100% Real QandAs | 100% Real Pass
C.
DS8700 system with two frames
D.
DS8800 system with two frames
Correct Answer: D
QUESTION NO:52
A storage specialist wants to create a fixed-block volume in the extent pool P10, in rank group 0. Which of
these volumes cannot be created?
A. 2001
B. 2B00
C. 3A01
D. 5E00
Correct Answer: B