Tens of thousands of competitors, pages of hard questions and unsatisfied exam preparation situations… Do not worried about all those annoying things! We, CertBus, help you with your Microsoft 070-297 Designing a Microsoft Windows Server 2003 Active Directory and Network Infrastructure exam. CertBus will assist you clear the 070-297 exam with 070-297 PDF and VCE questions. CertBus exam dumps are the most comprehensive ones.

We CertBus has our own expert team. They selected and published the latest 070-297 preparation materials from Microsoft Official Exam-Center: http://www.certgod.com/070-297.html

QUESTION NO:114

An IBM Business Partner has sold a DS5020 and new IBM SAN switches to replace a customer EMC

storage infrastructure. The customer dissatisfaction has arisen during the installation because according to

the DS5020 interoperability matrix, two HP Proliant servers running Exchange have FC HBAs that are not

supported. Which of the following is the most probable cause of the customer dissatisfaction?

A. The EMC storage specialist has not participated in the TDA meeting

B. The FC HBAs are 4 Gbps technology

C. The Technical and Delivery Assessment review actions were not executed

D. The customer should have checked that the HBAs are supported according to the HP storage

interoperability matrix

Correct Answer: C

QUESTION NO:86

After installation of Licensed internal code (LIC) and the base operating system, the administrator IPLs with “B Normal”. After the IPL completes, the administrator received the following message when attempting to complete the installation:

CPF3D8F: Cannot install library QGPL.

What is wrong and what must the administrator do to continue the installation?

A. Subsystems other than the controlling subsystem are running.End all subsystems and start installing the licensed programs again.

B. The IPL partition settings were not correct.Change the settings to “A Manual”, IPL the system again, then start installing the licensed programs.

C. The IPL should not have been run until the installation of licensed programs was successfully completed. Start the process again from the beginning.

D. The option to install the library QGPL was skipped during installation of the base operating system. Run the installation process again, install the QGPL library, and then continue the installation.

Correct Answer: A

QUESTION NO: 138

How can it be verified that the backup schedule job ran successfully and backed up all expected

files?

A. check the schedule log file

B. run the command query schedule -opt=success

C. run a selective backup andsee if the files are backed up

D. run a manual incremental backup andsee if the files are backed up

Answer: A

QUESTION NO:147

An administrator is installing Worklight Server on a stand-alone machine in a QA environment and has

already performed the following steps: 1.Created and initialized the Worklight databases 2.Defined and

configured the required application server resources Which additional step must the administrator perform

to use the Worklight Console to verify successful installation?

A. Deploy the Worklight Console adapter file.

B. Install the Worklight sample customization WAR file.

C.

Set the worklight.home JVM custom property to the location of the Worklight Console folder.

D.

Copy the worklight-jee-library.jar file to the application server\’s Worklight library folder.

Correct Answer: B

QUESTION NO:164

An administrator is creating a new connection to an existing system, but cannot connect successfully. Which action will resolve the problem?

A. Create a user profile for the connection.

B. Delete, recreate, and test the connection.

C. Enable the user profile for the connection.

D. Change the connection to be the Management Central system. Correct Answer: B