Free Download the Most Update CertBus Juniper ZJN0-343 Brain Dumps

Don’t worry about how to get yourself well prepared your ZJN0-343 exam! CertBus will work you out of your ZJN0-343 exam with the latest updated ZJN0-343 Enterprise Routing and Switching, Specialist (JNCIS-ENT)- For In Class Testing Only PDF and VCE dumps. CertBus provides the latest real Juniper ZJN0-343 exam preparation material, covering every aspect of ZJN0-343 exam curriculum.

We CertBus has our own expert team. They selected and published the latest ZJN0-343 preparation materials from Juniper Official Exam-Center: http://www.certgod.com/zJN0-343.html

QUESTION NO:16

Companycom has a 16 way 1.65 GHz p5 590 and wants to install a i5/OS partition on their

server. The customer wants to keep installation costs to a minimum by sharing devices between

all LPARs. Before the operating system can be installed in this partition, the customer was told

that there are certain limitations that must be observed. What are these limitations?

A. When the i5/OS partition is housed in the p5 590, the HMC allows seamless installation in a

partition as long as the minimum one processor, 256 MB of memory, one Ethernet and one

boot adapter/disk is available from internal hardware.

B. V5R3 and later releases of i5/OS can be installed on a POWER5 server partition. Only one

processor can be assigned to the i5/OS. A special expansion tower must be ordered. This

expansion tower and its devices can be shared with other OS partitions.

C. When the i5/OS partition is housed in the p5 590, the 5250 Twinaxial console must be used to

set up the partition. Only one processor can be assigned to the i5/OS partition. A special

expansion tower must be ordered to house the IOPs. Devices in the special expansion tower

can be shared with other Linux partitions.

D. V5R3 and later releases of i5/OS can be installed on IBM eServer p5 servers. i5/OS can run

on two processors in the p5 590. A special expansion tower must be ordered. This expansion

tower and its devices cannot be shared with other OS partitions. The iSeries expansion towers

are seen by the IBM eServer p5 server as an I/O subsystem.

Answer: D

QUESTION NO:159

A hybrid mobile application named App1 is failing to connect to the Worklight Server with the following

error code: “Application Error – The connection to the server was unsuccessful” Knowing that the

application should be available at “http://srv.ent.com:9099/wl” but without any access to the Worklight

Console, how can the support engineer ensure that the application App1 has been properly deployed?

A. Query the is-alive URL at “http://srv.ent.com:9099/wl/ws/rest/vitality?app=App1”

B. Query the preview URL at “http://srv.ent.com:9099/wl/apps/services/preview/App1/App1.html”

C. Invoke the Worklight Server Mobile Browser Simulator

at”http://srv.ent.com:9099/wl/_MobileBrowserSimulator/index.html?app=App1″

D.

Use a remote debugging tool such as Weinre or iWebInspector to inspect the request to the

application\’s init resource at”http://srv.ent.com:9099/wl/apps/services/api/App1/common/init”

Correct Answer: A

QUESTION NO:155

A developer needs to debug an adapter procedure with the Invoke Worklight Procedure tool. What is

ExamReal.com — 100% Real QandAs | 100% Real Pass

required to debug the procedure?

A. connectivity to the adapter\’s backend source

B. a running Jetty server to invoke the procedure

C. a filtered.xsl file to transform the response from the backend

D. an application connected to the adapter to view the invocation results

Correct Answer: A

QUESTION NO:19

A customer has one mainframe and ten open system servers in their current environment. They plan to

add the servers to an IBM DS8700 system with four array sites. How many extent pools should be created

to provide the best resource utilization of the DS8700?

A. 1

B. 2

C. 4

D. 6

Correct Answer: C

QUESTION NO:4

A system administrator is installing a p5 590 server with an HMC. After pulling the websm client

down, it is not possible to connect to the HMC. The HMC can be pinged from the client. Which of

the following settings should be verified next?

A. The routes on the HMC

B. The firewall setting of the LAN adapter

C. The name resolution protocol on the p5 590 server

D. The subnet mask settings on the Ethernet adapters

Answer: B