Don’t worry about how to get yourself well prepared your 000-350 exam! CertBus will work you out of your 000-350 exam with the latest updated 000-350 IBM WebSphere Transformation Extender V8.4 Applic Developmen PDF and VCE dumps. CertBus provides the latest real IBM 000-350 exam preparation material, covering every aspect of 000-350 exam curriculum.

We CertBus has our own expert team. They selected and published the latest 000-350 preparation materials from IBM Official Exam-Center: http://www.certgod.com/000-350.html

QUESTION NO:16

Companycom has a 16 way 1.65 GHz p5 590 and wants to install a i5/OS partition on their

server. The customer wants to keep installation costs to a minimum by sharing devices between

all LPARs. Before the operating system can be installed in this partition, the customer was told

that there are certain limitations that must be observed. What are these limitations?

A. When the i5/OS partition is housed in the p5 590, the HMC allows seamless installation in a

partition as long as the minimum one processor, 256 MB of memory, one Ethernet and one

boot adapter/disk is available from internal hardware.

B. V5R3 and later releases of i5/OS can be installed on a POWER5 server partition. Only one

processor can be assigned to the i5/OS. A special expansion tower must be ordered. This

expansion tower and its devices can be shared with other OS partitions.

C. When the i5/OS partition is housed in the p5 590, the 5250 Twinaxial console must be used to

set up the partition. Only one processor can be assigned to the i5/OS partition. A special

expansion tower must be ordered to house the IOPs. Devices in the special expansion tower

can be shared with other Linux partitions.

D. V5R3 and later releases of i5/OS can be installed on IBM eServer p5 servers. i5/OS can run

on two processors in the p5 590. A special expansion tower must be ordered. This expansion

tower and its devices cannot be shared with other OS partitions. The iSeries expansion towers

are seen by the IBM eServer p5 server as an I/O subsystem.

Answer: D

QUESTION NO:66

Companycom has the following: 8 x 1.65GHz CPUs 16GB Memory 4 LPARs LPAR 1: Test/Dev 1

CPU, 2GB Memory, 1 Fibre Channel HBA, AIX 5.3 LPAR 2: QA 1 CPU, 2GB Memory, 1 Fibre

Channel HBA, AIX 5.3 LPAR 3: Prod 3 CPUs, 6GB Memory, 1 Fibre Channel HBA, AIX 5.3 LPAR

4: Web App 3 CPUs, 6GB Memory, 1 Fibre Channel HBA, SUSE Linux Utilization over a 30 day

period LPAR 1: Average utilization was

15%, Peak utilization was 100% LPAR 2: Average utilization was 25%, Peak utilization was 100%

LPAR 3: Average utilization was 50%, Peak utilization was 90% LPAR 4: Average utilization was

35%, Peak utilization was 100% If the customer has a requirement for all four LPARs moved to a

p5 590 and to have dedicated CPU resources, which of the following would best describe the

profile requirements?

A. LPARs 1 and 2, SMT on, min CPU 1.0, max CPU 1.0, desired CPU 1.0 LPARs 3 and 4, SMT

on, min CPU 1.0, max CPU 3.0, desired CPU 2.0

B. LPARs 1 and 2, SMT on, min CPU 1.0, max CPU 1.0, desired CPU 1.0 LPARs 3 and 4, SMT

on, min CPU 2.0, max CPU 3.0, desired CPU 3.0

C. LPARs 1 and 2, SMT on, min CPU 1.0, max CPU 3.0, desired CPU 3.0 LPARs 3 and 4, SMT

on, min CPU 1.0, max CPU 3.0, desired CPU 2.0

D. LPARs 1 and 2, SMT off, min CPU 1.0, max CPU 1.0, desired CPU 1.0 LPARs 3 and 4, SMT

off, min CPU 1.0, max CPU 3.0, desired CPU 3.0

Answer: B

QUESTION NO:108

A storage specialist is explaining to the customer that relational databases need an additional point-in-time

copy process to assure data in memory buffers are flushed to disk prior to the hardware based snapshot

command being executed. Which IBM software solution provides usable and consistent point-in-time data

copies?

ExamReal.com — 100% Real QandAs | 100% Real Pass

A. Tivoli Storage Productivity Center for Disk

B. Tivoli Continuous Data Protection for Files

C. Tivoli StorageFlashCopy Manager

D. Tivoli Storage Productivity Center for Data

Correct Answer: C

QUESTION NO:140

An HTTP adapter is deployed on a Worklight server. Which steps need to be taken by the developer to

receive data from the adapter in an application?

A. Create an invocationData object that contains the adapter and procedure names and send it through

the WL.Server.invokeProcedureAPI with the onSuccess and onFailure callbacks.

B. Create an invocationData object that contains the adapter and procedure names and send it through

the WL.Client.invokeProcedureAPI with the onSuccess and onTimeout callbacks.

C.

Create an invocationData object that contains the adapter and procedure names and send it through

the WL.Client.invokeProcedureAPI with the onSuccess and onFailure callbacks.

D.

Create an invocationData object that contains the backend URL and procedure name and send it

through theWL.Client.invokeProcedure API with the onSuccess and onTimeout callbacks.

Correct Answer: C

QUESTION NO:26

A customer with a small IT budget has one data center. Their main application is a database running on an

IBM System Storage DS8000. The database has a data change rate of 50% per day. Once a week, they

must do a point-in-time backup from the database to tape. The time it takes to run the backup now exceeds

the backup window allowed. The customer requests a proposal to reduce database downtime

caused by running backups, with nearly zero impact to production volumes. In addition to the tape backup,

which DS8000 feature should a technical specialist propose?

A. FlashCopy

B. FlashCopy SE

C. Metro Mirror

D. Global Mirror

Correct Answer: A