CertBus New Updated COG-300 Exam Dumps Free Download

One of my colleague recommend me that CertBus COG-300 dumps are effective and helpful. Thank goodness I followed up with him and choose CertBus as my assistance on my COG-300 IBM Cognos TM1 Analyst certification exam! I passed my IBM COG-300 exam very easily. I was lucky, all my questions in the exams were from my IBM COG-300 dumps.

We CertBus has our own expert team. They selected and published the latest COG-300 preparation materials from IBM Official Exam-Center: http://www.certgod.com/COG-300.html

QUESTION NO:2

An SLM Policy has been associated with a web service proxy to restrict access to a backend web service if

one of a number of conditions has been met. The list of conditions are described in a series of SLM

statements. What Evaluation Method must the solution implementer select in the SLM Policy to ensure that

every SLM statement is checked until a throttle condition is executed?

A. terminate-at-first-filter

B. terminate-at-first-reject

C. terminate-at-first-action

D. terminate-at-first-refuse

Correct Answer: B

QUESTION NO:137

Given the following code in an application\’s initOptions.js file:

What is the expected result when starting the application on a device?

A. The onSuccess function will be invoked every time the application is loaded.

B. The WL.Client.init method will not be executed because WLJSX.bind is not supported in Worklight.

C.

The onConnectionFailure function will be invoked, because the connectOnStartup property is set to

false.

D. The server related function would not be available until the developer calls the

WL.Client.reloadApp function to invoke the serverconnection.

Correct Answer: A

QUESTION NO:9

A company has just purchased a new POWER7 server running IBM i 7.1 to replace an older system running V5R4M5. Due to a mistake by a programmer on the V5R4 system, data was accidently deleted. To recover, the administrator backs up the deleted data to virtual tape on the 7.1 server and attempts to restore it on the V5R4 server. The restore on the V5R4 server fails with a message stating the data was saved from a more recent release of the operating system.

Which option will solve this problem?

A. Save the data to physical media.

B. Set the target release parameter to V5R4M0 when saving the data.

C. ETP the virtual tape image catalog from the 7.1 server using binary mode.

D. Use the target release parameter *RECOVER and the access path parameter set to VSR4MO.

Correct Answer: B

QUESTION NO:61

An operations team is reporting intermittent network connectivity problems between DataPower and a

specific backend IP address. Network firewalls are configured to allow traffic and there are no known

problems on the network. How can the solution implementer troubleshoot this behavior?

A. There is no network load balancer used behind DataPower. Install a network load balancer.

B. The backend system may be rejecting all TCP packets. Apply the latest fixpacks and restart the server.

C. A DNS host name may be used for connecting to the backend system. Intermittent errors could be

caused due to the DNS names not being resolved. Use a host alias instead.

D. Conflicting network routes in the appliance may have been defined which may be causing intermittent

network connections. Run “show route” command on the network and analyze the configuration.

Correct Answer: D

QUESTION NO:34

A customer RFP requires installation of an open system SAN and migration of 40 TB currently residing on

ten UNIX servers (on internal server disk). The Service Level Agreement (SLA) requires no more than five

minutes per week of planned downtime for backup. Which IBM System Storage solution is the most cost

effective?

A. an IBM System Storage DS8700 with LTO tape drive

B. an IBM System Storage DS8700 with FlashCopy Manager

C. an IBM XIV Storage System

D. an IBM XIV Storage System with SAN Volume Controller

Correct Answer: C