There is no need to worry about the difficulties on the 000-007 exam preparation. CertBus will assist you pass your 000-007 exam with up to date 000-007 IBM Tivoli Netcool/OMNIbus V7.3 Implementation PDF and VCE dumps. CertBus provides the most update real 000-007 exam preparation material, covering each and every aspect which real 000-007 exam requires. We ensure you 100% success in 000-007 exam.
We CertBus has our own expert team. They selected and published the latest 000-007 preparation materials from IBM Official Exam-Center: http://www.certgod.com/000-007.html
QUESTION NO:20
A customer has a storage requirement for a mixed IBM Power AIX and System z environment. They
require approximately 3 TB of high performance disk for their System z environment. They require
approximately 32 TB of low-performance disk for their System p environment. The storage specialist is
using Capacity Magic to configure an IBM DS8700. Which configuration is most appropriate for this
customer?
A. 2 x 300 GB 15k rpm disk drive sets for System z; and 4 x 2 TB 7.2k rpm disk drive sets for Power AIX
B. 4 x 146 GB 15k rpm disk drive sets for System z; and 4 x 2 TB 7.2k rpm disk drive sets for Power AIX
C.
2 x 300 GB 10k rpm disk drive sets for System z; and 4 x 300 GB 15k rpm disk drive sets for Power
AIX
D.
2 x 300 GB 15k rpm disk drive sets for System z; and 2 x 1 TB 7.2k rpm disk drive sets for Power AIX
Correct Answer: A
QUESTION NO:69
A solution implementer is considering the following active-standby configuration between two DataPower
appliances:
In a simulated power failure of Appliance 1 using this active-standby configuration in a sandbox
environment, Appliance 2 did not take over the active interface. What could be causing this behavior?
A. It can take several minutes for the standby interfaces to be active in an active-standby configuration.
B. Appliances in the active-standby configuration must be in the same network subnet and broadcast
domain.
C. In an active-standby configuration, the priority of Appliance 2 must be changed to 99 for the failure
takeover to work.
D. There might be a firewall between the two appliances which has not been configured to allow
broadcast traffic in an active-standby configuration.
Correct Answer: B
QUESTION NO:16
Which IBM BPM playback methodology milestone helps enable the implementation to be successful?
A. Process discovery
B. Production environment validation
C. Prototyping of complex integrations
D. Requirements contract negotiations
Correct Answer: A
QUESTION NO:127
A developer is writing a Worklight mobile application to run on Android and iOS platforms. The developer is
using the Apache Cordova device.platform API in the code to identify the device\’s platform type. Which
additional step, if any, should the developer perform before building and deploying the application to
successfully use the Apache Cordova API?
A. Set the element to true in the application\’s descriptor file to indicate the use of Cordova.
B. Copy the cordova.jar library file to the project\’s server folder to make it available to the application
at run-time.
ExamReal.com — 100% Real QandAs | 100% Real Pass
C. No additional step is required since the Cordova framework is automatically added into Worklight
iOS and Android projects.
D.
Add a element to the application\’s main HTML file to include the cordova.js JavaScript file
that defines the API functions.
Correct Answer: C
QUESTION NO:24
A BPM application developer is creating a General System Service that calls an Integration
Service. The General System Service must handle exceptions coming from the integration
service. How should the BPM application developer implement error handling?
A. Error End Event
B. Error Intermediate Event
C. Throw Statement(s)
D. Try/Catch Statement(s)
Answer: B