Do not worry about that if you are stuck in the M9560-727 exam difficulties, CertBus will assist you all your way through the M9560-727 Cloud and Smarter Infrastructure Cloud and Service Management Sales Mastery v1 exam with the most update M9560-727 PDF and VCE dumps. CertBus exam M9560-727 preparation materials are the most comprehensive material, covering every key knowledge of M9560-727 Cloud and Smarter Infrastructure Cloud and Service Management Sales Mastery v1 exam.

We CertBus has our own expert team. They selected and published the latest M9560-727 preparation materials from IBM Official Exam-Center: http://www.certgod.com/m9560-727.html

QUESTION NO: 59

When you run your tests, you notice that the curves are noisy.

How can you correct this and smooth your results?

A. change the logging level

B. increase the number of users

C. reduce the statistical sampling rate

D. add a synchronization point

Answer: C

QUESTION NO: : 83

Which statement is true regarding operating system patches and IBM Tivoli Access

Manager V6.1.1 Runtime running on Windows XP?

A. No patch is required.

B. IBM Tivoli Access Manager Runtime does not run on Windows XP.

C. The minimum patch level needed is Professional Version Service Pack 1.

D. The minimum patch level needed is Professional Version Service Pack 2.

Answer: D

Explanation:

QUESTION NO: 89

A customer is consolidating two POWER6 595 servers to a single Power 795. The two 595 servers each

have 24 active processors and have the following LPARs using dedicated processors, running

continuously:

The new Power 795 system will have two Processor Books (nodes), each with 8 cores activated in all

MCMs (Multi Chip Modules).

LPAR1 is in need of more processing power. If all the other LPARs keep their existing Processor

allocation, what is the maximum number of processors which can be allocated to LPAR1?

A. 27

B. 32

C. 36

D. 100

Correct Answer: B

QUESTION NO: 87

An administrator is creating Virtual IO servers (VIOS) on a new POWER7 server, anticipating that Live

Partition Mobility (LPM) will be used in the environment. Which action must be taken before LPM

operations can begin?

A. Ensure that AIX Enterprise Edition is loaded on the VIO server partition.

B. Check the Mover Service Partition box on the partition properties panel on the HMC.

C. Create the same number of VIOS partitions on all servers.

D. Configure SEA failover for all VIOS partitions

Correct Answer: B

QUESTION NO: 136

An administrator has a Power 720 with 64GB of memory and Active Memory Expansion (AME).

An LPAR has only 10GB of memory available and an application has been sized at 15GB of memory. The

administrator runs amepat to determine an efficient expansion factor. Based on the output, an expansion

factor of 1.6 has been chosen.

How should this be configured in the LPAR?

A. Enter 16GB as \’desired\’, enter 1.6 in the Active memory expansion factor field.

B. Enter 10GB as \’desired\’, enter 1.6 in the Active memory expansion factor field.

C. Enter 10GB as \’desired\’ and modify/etc/ame.conf with AME_RATIO=1.6.

D. Enter 16GB as \’desired\’ and modify/etc/ame.conf with AME_RATIO=1.6.

Correct Answer: B