Free Share CertBus IBM 000-R24 Exam Dumps and Practice Questions and Answers

Do not worry about your 000-R24 exam preparation? Hand over your problems to CertBus in change of the 000-R24 IBM SurePOS 300 Series Models 34x and E4x Tech Mastery certifications! CertBus provides the latest IBM 000-R24 exam preparation materials with PDF and VCEs. We CertBus guarantees you passing 000-R24 exam for sure.

We CertBus has our own expert team. They selected and published the latest 000-R24 preparation materials from IBM Official Exam-Center: http://www.certgod.com/000-R24.html

QUESTION NO:27

An administrator issues the WRKSYSACT command on a system partition using dedicated processors and the following result displays:

Current processing capacity 2

What does the current processing capacity value indicate?

A. The percentage of CPU currently available for system jobs.

B. The share of the physical processors in the pool it is running.

C. The number of processing units currently assigned to the partition.

D. The number of virtual processors that are currently active in the partition.

Correct Answer: C

QUESTION NO:63

Companycom is planning on upgrading from a pSeries S85 running AIX 4.3.3 to a p5 570 with an

HMC. The new server will run AIX 5L 5.2. What should be performed prior to the migration?

A. Verify the ISV application runs on AIX 5.2

B. Power4 to POWER5 upgrades are not supported without a application recompile

C. Check the placement and size of the boot logical volume and disk space requirements on the

S85

D. AIX 4.3.3 to AIX 5L 5.2 migrations are perfectly compatible so nothing needs to be checked

Answer: A

QUESTION NO:134

A developer is invoking WL.Client.invokeProcedure(invocationData, options), using the options object and

callback functions that are shown below.

Which two statements describe the outcome of this scenario? (Choose two.)

A. The invocationContext will be returned to the success and failure handlers.

B. The function failure will be invoked on client-side errors, however, not invoked on server-side errors.

C. The data returned by the invoked procedure is saved on response.invocationResult in the case of a

successful call.

D. The data returned by the invoked procedure is saved on response.invocationContext in the case of a

successful call.

E. The data returned by the invoked procedure is saved on response.invocationResult in the case of an

unsuccessful call.

Correct Answer: AC

QUESTION NO:75

A customer has multiple applications on multiple open platforms in their current environment based on IBM

System Storage DS8100. They plan to set up a business continuity solution that meets the objective of

zero or little data loss for their business critical data. The customer has indicated that cost is a factor.

What should the storage specialist recommend?

A.

a DS8700 in the Business Continuity site with a Metro Mirror license

B.

a DS8700 with SAN Volume Controller in the Business Continuity site

C. a DS8700 in the Business Continuity site with Global Copy license

D. two new DS5300 servers (production and Business Continuity site) with a Global Copy license

Correct Answer: A

QUESTION NO: 48

What is the difference between elasticity and scalability?

A. Scalability is the ability to react to workload changes dynamically. Elasticity is being able to

accommodate new demands.

B. Scalability is the ability to handle short term spikes of demand. Elasticity means the capacity

can expand to meet demand over the long term.

C. Elasticity is the ability to utilize public cloud resources during high demand periods. Scalability

is being able to handle all demands within a private cloud.

D. Elasticity is the ability to handle short term spikes of demand while maintaining acceptable

performance. Scalability is having sufficient capacity to handle planned future demand.

Answer: D

Explanation: