[PDF and VCE] CertBus Latest IBM A2180-178 Exam Practice Materials Free Downloading

CertBus ensures to provide the most update A2180-178 Assessment: IBM WebSphere Lombardi Edition V7.2, BPM Development exam questions with the most accurate answers. CertBus A2180-178 are the most complete and authoritative exam preparation materials with which one can pass the A2180-178 exam in an easy way. Preparing for IBM A2180-178 Assessment: IBM WebSphere Lombardi Edition V7.2, BPM Development exam is really a tough task to accomplish. But CertBus will simplified the process.

We CertBus has our own expert team. They selected and published the latest A2180-178 preparation materials from IBM Official Exam-Center: http://www.certgod.com/A2180-178.html

QUESTION NO: 25

A solution implementer is configuring a single multi-protocol gateway to dynamically route

messages to back end servers. For internal consumers the request needs to be routed to an MQ

based back end and for external consumers the request needs to be routed to an HTTP based

back end service. How can the solution implementer satisfy this requirement?

A. Use the xset-target extension function.

B. Select a route action with an XPath routing map.

C. Set the variable var://service/routing-url.

D. Set the variables var://service/URI for the server and var://service/protocol-method for the

protocol type.

Answer: C

Explanation:

QUESTION NO: 216

A storage pool is running out of tape volumes. The pool contains many tapes with a status of full

and which have a low percent utilization. What can be done to free up tape volumes?

A. change the copy storage pool settings

B. change the pool to a transient data pool

C. change the reclaim threshold for the tape storage pool

D. change the compression setting for the tape device class

Answer: C

QUESTION NO:41

There is a requirement for a business process diagram to have two subsequent activities routed to

the same user. During a demonstration, a business user notices that upon completing the first task

they must return to their inbox to start the next task. The business user would prefer to have the

second task automatically appear upon completion of the first task and asks the BPM application

developer what options are available. How should the BPM application developer respond? This

can be configured by:

A. making a change to the 100Custom.xml file.

B. changing the first activity\’s routing to “Last User in Lane”.

C. changing the second activity\’s routing to “Last User in Lane”.

D. changing the implementation of the activity and selecting the “Automatically flow to next task”

check box.

Answer: D

QUESTION NO:147

An administrator is installing Worklight Server on a stand-alone machine in a QA environment and has

already performed the following steps: 1.Created and initialized the Worklight databases 2.Defined and

configured the required application server resources Which additional step must the administrator perform

to use the Worklight Console to verify successful installation?

A. Deploy the Worklight Console adapter file.

B. Install the Worklight sample customization WAR file.

C.

Set the worklight.home JVM custom property to the location of the Worklight Console folder.

D.

Copy the worklight-jee-library.jar file to the application server\’s Worklight library folder.

Correct Answer: B

QUESTION NO:142

A system with IBM i 7.1 has at least one lPv6 address configured. When a user tries to ping a remote system by name, the response takes a long time. Ping by IP address (for example 10.x.x.x) works without delay.

Which action will fix this problem?

A. Use the command CHGTCPDMN and set the parameter HOSTSCHPTY to *LOCAL.

B. Use the command CHGTCPDMN and set the parameter HOSTSCHPTY to *REMOTE.

C. Update the Host Table Entries and add a IPv4 for that remote system name.

D. Change the ping command default as follows: CHGCMDDFT CMD(PING) NEWDFT(ADRVERFMT (*IP4))

Correct Answer: D