Free Sharing CertBus Updated IBM P2090-076 VCE and PDF Exam Practice Materials

Do not worry about that if you are stuck in the P2090-076 exam difficulties, CertBus will assist you all your way through the P2090-076 IBM InfoSphere Master Data Management Server Technical Mastery Test v1 exam with the most update P2090-076 PDF and VCE dumps. CertBus exam P2090-076 preparation materials are the most comprehensive material, covering every key knowledge of P2090-076 IBM InfoSphere Master Data Management Server Technical Mastery Test v1 exam.

We CertBus has our own expert team. They selected and published the latest P2090-076 preparation materials from IBM Official Exam-Center: http://www.certgod.com/P2090-076.html

QUESTION NO:133

A change to POWER7 server firmware is being planned on an HMC managed system. The current server firmware level is AL720_108_066, and the new server firmware level will be AL730_078_035.

What must the administrator take into consideration for this task?

A. A backup of critical FSP data needs to be scheduled.

B. Downtime needs to be scheduled as this will be a disruptive update.

C. The system ESP should have both network ports configured to the HMC to guard against HMC connection loss.

D. Ensure the “Apply Immediate” option is selected on the Submit Task panel so the update will be concurrent.

Correct Answer: B

QUESTION NO:9

A company has just purchased a new POWER7 server running IBM i 7.1 to replace an older system running V5R4M5. Due to a mistake by a programmer on the V5R4 system, data was accidently deleted. To recover, the administrator backs up the deleted data to virtual tape on the 7.1 server and attempts to restore it on the V5R4 server. The restore on the V5R4 server fails with a message stating the data was saved from a more recent release of the operating system.

Which option will solve this problem?

A. Save the data to physical media.

B. Set the target release parameter to V5R4M0 when saving the data.

C. ETP the virtual tape image catalog from the 7.1 server using binary mode.

D. Use the target release parameter *RECOVER and the access path parameter set to VSR4MO.

Correct Answer: B

QUESTION NO:24

A customer would like to implement an IBM System Storage DS8000 solution that requires 225 TB raw

capacity. They are convinced that 450 GB is the optimum size for their business applications. There is

limited space available for additional machines in the data center. Which solution meets best this

requirement?

A. DS8700 system with three frames

B. DS8800 system with threeframe

C. DS8700 system with two frames

D. DS8800 system with two frames

Correct Answer: D

QUESTION NO:150

A developer is implementing an HTTP adapter that connects to a public web service. After

performing field tests, the developer has observed that the adapter times out too frequently.

What is the correct way to set the adapter\’s timeout period?

ExamReal.com — 100% Real QandAs | 100% Real Pass

A. Option A

B. Option B

C. Option C

D. Option D

Correct Answer: B

QUESTION NO:166

A developer wants to implement an adapter authentication solution. The developer created the following

challenge handler:

What should be placed in the “to be filled” parameter?

A. realm name

B. module name

C. procedure name

D. security test name

ExamReal.com — 100% Real QandAs | 100% Real Pass

Correct Answer: A