Do not worry about that if you are stuck in the 000-M25 exam difficulties, CertBus will assist you all your way through the 000-M25 IBM Rational Team Concert Technical Sales Mastery Test exam with the most update 000-M25 PDF and VCE dumps. CertBus exam 000-M25 preparation materials are the most comprehensive material, covering every key knowledge of 000-M25 IBM Rational Team Concert Technical Sales Mastery Test exam.

We CertBus has our own expert team. They selected and published the latest 000-M25 preparation materials from IBM Official Exam-Center: http://www.certgod.com/000-M25.html

QUESTION NO:144

A batch job is running a report at priori 50 on a system using IBM defaults for job run priorities. The report results are needed as soon as possible without disrupting interactive users.

Which run priority value will support the requirement?

B. 20

C. 40

D. 60

Correct Answer: C

QUESTION NO: 144

An administrator is planning to configure two new Power Systems servers for Live Partition Mobility (LPM).

Each server will be connected to a separate HMC. What is required to achieve this in addition to those

requirements needed for LPM with a common HMC?

A. An RMC connection between each VIO partitionSSL key exchange between each VIO partition and all

FSPs

B. An RMC connection between both HMCsSSH key exchange between all HMCs and FSPs

C. A common IP network between all VIO partitionsRMC key exchange between both HMCs and all VIO

partitions

D. A common IP network between both HMCs SSH key exchange between both HMCs

Correct Answer: D

QUESTION NO: 44

How is the Backup-Archive client set up with remote access in IBM Tivoli Storage Manager V6.2

(TSM)?

A. use the TSM VNC client

B. configure the remote node on each client system

C. setup and customize the TSM Web client on each Backup-Archive client system

D. setup and customize the TSM remote access client on each Backup-Archive client system

Answer: C

QUESTION NO:166

A developer wants to implement an adapter authentication solution. The developer created the following

challenge handler:

What should be placed in the “to be filled” parameter?

A. realm name

B. module name

C. procedure name

D. security test name

ExamReal.com — 100% Real QandAs | 100% Real Pass

Correct Answer: A

QUESTION NO:109

During frequent communications failure hundreds of jobs are being ended at once. The production of these job logs significantly impact the system resources, and many spooled files are created. How could the administrator avoid the production of these job logs?

A. Set the QINACTMSGQ system value to *NOJOBLOG

B. Set the QCMNRCYLMT system value to infinite recovery attempts.

C. Set the LOGOUTPUT (Job log output) parameter to *PND in the job description.

D. Set the LOG (Message logging) parameter to 4 0 *NOLIST in the job description.

Correct Answer: C