Which certification is the most popular and worthy to get? No doubt the 000-654 IBM Tivoli Application Dependency Discovery Mgr V7.2.1.3 exam is a worth challenging task but you should take among all the IT certifications . CertBus is providing the latest version of 000-654 PDF and VCE dumps now. Comprehensive understanding on 000-654 IBM Tivoli Application Dependency Discovery Mgr V7.2.1.3 exam syllabus through CertBus 100% pass guarantee of the success on your 000-654 IBM Tivoli Application Dependency Discovery Mgr V7.2.1.3 exam taking.
We CertBus has our own expert team. They selected and published the latest 000-654 preparation materials from IBM Official Exam-Center: http://www.certgod.com/000-654.html
QUESTION NO:17
An administrator wants to ensure a job on the scheduler is ignored if the system is in a restricted state at the time it is scheduled to run. What change will make this occur?
A. Change the recovery action of the job schedule entry to *NOSBM.
B. Change the user profile on the job schedule entry to QRECOVERY.
C. Change the frequency option of the job schedule entry to *ACTIVE.
D. Use the option on the WRKJQBSCDE screen for “hold when restricted.”
Correct Answer: A
QUESTION NO: 20
A fashion retailer would like to start taking pre-orders for an upcoming new line of merchandise.
Orders get stamped with the advertised release date of the merchandise. To prevent spurious
procurements from being triggered, the retailer wants the orders to be sourced only a few days
ahead of the inventory being available. Which option will address this requirement?
A. The orders should be put on a scheduling hold, and the hold released a few days before the
advertised product release date.
B. The scheduling rule can have a lead day of \’X\’ days configured so orders will be scheduled only
that many days ahead of the advertisedrelease date.
C. The scheduling rule can be configured to retry every \’X\’ hours so the orders will remain
backordered until the advertised release date of theproduct is reached.
D. The order can have an expected ship date way out in the future (like 1/1/2100) so the
scheduling agent will not pick up these orders. Theexpected ship date can then be changed a few
days before inventory becomes available.
Answer: B
Explanation:
QUESTION NO:37
Companycom has a p690 server with unused fiber (HBA) host bus adapters (feature code 6228)
that they would like to reuse. They are interested in implementing Advanced Power Virtualization
features particularly Virtual IO. What is the best way to proceed?
A. Upgrade the p690 to a p5 590 server running AIX 5.3
B. Upgrade the p690 server to AIX 5.3 and implement Advanced Power Virtualization
C. Purchase a p5 590 with minimum resources and simply reuse the p690 unused fiber HBA
adapters
D. Purchase a p5 590 that has all the needed resources and adapters for Advanced Power
Virtualization
Answer: D
QUESTION NO:71
Which of the following would NOT qualify as a
QUESTION NO:22
Companycom is purchasing a p5 590 which was configured with 60 Amp line cords. They have
just indicated that their large datacenter is already wired for 100 Amp power circuits in the
location where the server will be installed. What would be the recommended action?
A. Use the 60 Amp line cords
B. Change the 100 Amp connector to a 60 Amp circuit
C. Submit an RPQ to order the p5 590 with 100 Amp power cords
D. Change the configuration and order the p5 590 with the 100 Amp power cords
Answer: D