Do not worry about that if you are stuck in the 000-020 exam difficulties, CertBus will assist you all your way through the 000-020 IBM Tivoli Access Manager for Enterprise Single Sign-On V8.0.1 Implementation exam with the most update 000-020 PDF and VCE dumps. CertBus exam 000-020 preparation materials are the most comprehensive material, covering every key knowledge of 000-020 IBM Tivoli Access Manager for Enterprise Single Sign-On V8.0.1 Implementation exam.
We CertBus has our own expert team. They selected and published the latest 000-020 preparation materials from IBM Official Exam-Center: http://www.certgod.com/000-020.html
QUESTION NO:50
What are the IBM recommended setup steps for the system audit journal and journal receivers when using library JRNLIB as the secured library?
A. CRTJRNRCV JRNRCV(JRNLIB/AUDRCV0001) AUT(*USE)CRTJRN JRN(JRNLIB/QAUDJRN) JRNRCV(JRNLIB/AUDRCVOIJO1) MNGRCV(*SYSTEM) DLTRCV(*YES) AUT (*USE)
B. CRTJRNRCV JRNRCV(JRNLIB/AUDRCV0001) AUT(*EXCLUDE)CRTJRN JRN(JRNLIB/QAUDJRN) JRNRCV(JRNLIB/AUDRCV0001) MNGRCV(*USER) DLTRCV(*YES) AUT(*USE)
C. CRTJRNPCV JRNRCV(QSYS/AUDRCV0001) AUT(*FXCLUDE)CRTJRN JRN(QSYS/QAUDJRN) JRNRCV(JRNLIB/AUDRCV0001) MNGRCV(*SYSTEM) DLTRCV(*NO) AUT (*EXCLUDE)
D. CRTJRNRCV JRNRCV(JRNLIB/AUDRCV0001) AUT(*EXCLUDE)CRTJRN JRN(QSYS/QAUDJRN) JRNRCV(JRNLIB/AUDRCV0001) MNGRCV(*SYSTEM) DLTRCV(*NO) AUT (*EXCLUDE)
Correct Answer: D
QUESTION NO: 62
Which command can only be used with the manual installation for the Windows TSM server?
A. db2start
B. db2 updatedbm cfg using dftdbpath f:
C. db2icrt -a SERVER -u tsminst1tsminst1
D. db2 updatedbm cfg using dftdbpath /home/tsminst1
Answer: B
QUESTION NO:149
A developer needs to call a Java class that is packaged in a JAR file from an adapter. Where should this
JAR file be placed in the project\’s folder structure?
A. server/java
B. server/lib
C. adapters/java
D. adapters/lib
ExamReal.com — 100% Real QandAs | 100% Real Pass
Correct Answer: B
QUESTION NO: 41
A customer has the following equipment installed in their data center:
–an IBM BladeCenter H chassis
–two power supplies
–six LS21 blades
–twoNortel L27 GESMs
The customer purchased a new LS22 7901 blade server and a BladeCenter Storage and I/O (SIO)
Expansion blade with two 146GB SAS drives. The customer is now unable to load a supported
network operating system to the LS22. Which of the following must be done so the operating
system can be successfully loaded?
A. add two additional power supplies
B. update the BIOS and firmware of the LS22
C. use theServeRAID Manager to create the RAID array
D. use theServerGuide CD to install the operating system
Answer: A
QUESTION NO:147
An administrator is installing Worklight Server on a stand-alone machine in a QA environment and has
already performed the following steps: 1.Created and initialized the Worklight databases 2.Defined and
configured the required application server resources Which additional step must the administrator perform
to use the Worklight Console to verify successful installation?
A. Deploy the Worklight Console adapter file.
B. Install the Worklight sample customization WAR file.
C.
Set the worklight.home JVM custom property to the location of the Worklight Console folder.
D.
Copy the worklight-jee-library.jar file to the application server\’s Worklight library folder.
Correct Answer: B