As a leading IT exam study material provider, CertBus not only provides you the ICBB exam questions and answers but also the most comprehensive knowledge of the whole Lean Six Sigma Black Belt ICBB IASSC Certified Lean Six Sigma Black Belt certifications. We provide our users with the most accurate ICBB IASSC Certified Lean Six Sigma Black Belt study material about the Lean Six Sigma Black Belt ICBB exam and the guarantee of pass. We assist you to get well prepared for Lean Six Sigma Black Belt ICBB certification which is regarded valuable the IT sector.

We CertBus has our own expert team. They selected and published the latest ICBB preparation materials from IASSC Official Exam-Center: http://www.certgod.com/ICBB.html

QUESTION NO:3

Which of these graphs demonstrates conditions which would be sufficient to enable OCAP for the

process?

A. Xbar Chart

B. Time Series Chart

C. Neither

D. Both

Answer: A

2


QUESTION NO:2

For her injection molding project a Belt needed to track the percentage of defectives of a particular

sample set so she used a ___________ to display the data?

A. Individual Chart

B. C Chart

C. Xbar Chart

D. P Chart

Answer: D


QUESTION NO:10

4

Following the completion of a LSS project the Belt not only creates a Control Plan he also

develops a _____________ so those involved in the process know what to do when the critical

metrics move out of spec.

A. Response Plan

B. Call List

C. Chain-of-Command

D. Defect Analysis Plan

Answer: A


QUESTION NO:16

How many experimental runs exist in a Full Factorial and fully randomized design for 4 factors with

2 replicates for the Corner Points and no Center Points? The factors in the experiment are only at

2-levels.

A. 10

7

B. 32

C. 256

D. 64

Answer: B


QUESTION NO:4

Control Charts were developed by Dr. Shewhart to track data over time. To detect Special Cause

variation the Control Charts use which of these?

A. Data shift analysis

B. Outlier analysis methods

C. Center Line and Control Limits

D. None of the above

Answer: C


QUESTION NO:1

A ___________ is used primarily to track the stability of the average value of a metric of interest.

A. NP Chart

B. Xbar-R Chart

C. I-MR Chart

D. C Chart

Answer: B


QUESTION NO:9

When a Belt Poka-Yoke’s a defect out of the process entirely then she should track the activity

with a robust SPC system on the characteristic of interest in the defect as an early warning

system.

A. True

B. False

Answer: B


QUESTION NO:13

5

Upon completion and validation of an improvement to a process a Belt and the Project Team

create a Control Plan that contains which of these?

A. Standard operating work description of the process change

B. Description of the monitoring system in place to assure continued compliance

C. Summary of the targeted critical metrics for process performance measurement

D. All of the above

Answer: D


QUESTION NO:17

If an experiment has 5 factors and no replicates for a 2-level Experimental Design with 16

experimental runs which statement is incorrect?

A. The Experimental Design is half-fractional

B. The Main Effects are confounded with only 4-way interactions

C. The Main Effects for the 5 factors are not aliased or confounded but the 2-way interactions are

confounded with the 3-way interactions

D. The experiment has 8 experimental runs with the first factor at the high level

Answer: C


QUESTION NO:18

Which statement(s) are correct about the Pareto Chart shown here for the DOE analysis? (Note:

There are 2 correct answers).

8

A. It is unknown from this graph how many factors were in the Experimental Design

B. The factors to keep in the mathematical model are E, D, DE, BD and B with an alpha risk equal

to 2.06

C. The effects to keep in the mathematical model are E, D, DE, BD and B with an alpha risk equal

to 0.05

D. The factors to keep in the mathematical model with a 5% alpha risk are BE, AB, A and AD

Answer: A,C


CertBus exam braindumps are pass guaranteed. We guarantee your pass for the ICBB exam successfully with our IASSC materials. CertBus IASSC Certified Lean Six Sigma Black Belt exam PDF and VCE are the latest and most accurate. We have the best IASSC in our team to make sure CertBus IASSC Certified Lean Six Sigma Black Belt exam questions and answers are the most valid. CertBus exam IASSC Certified Lean Six Sigma Black Belt exam dumps will help you to be the IASSC specialist, clear your ICBB exam and get the final success.

ICBB Latest questions and answers on Google Drive(100% Free Download): https://drive.google.com/file/d/0B_3QX8HGRR1mS0FXTWhWQ2l5dXc/view?usp=sharing

ICBB IASSC exam dumps (100% Pass Guaranteed) from CertBus: http://www.certgod.com/ICBB.html [100% Exam Pass Guaranteed]

Why select/choose CertBus?

Millions of interested professionals can touch the destination of success in exams by certgod.com. products which would be available, affordable, updated and of really best quality to overcome the difficulties of any course outlines. Questions and Answers material is updated in highly outclass manner on regular basis and material is released periodically and is available in testing centers with whom we are maintaining our relationship to get latest material.

BrandCertbusTestkingPass4sureActualtestsOthers
Price$45.99$124.99$125.99$189$69.99-99.99
Up-to-Date Dumps
Free 365 Days Update
Real Questions
Printable PDF
Test Engine
One Time Purchase
Instant Download
Unlimited Install
100% Pass Guarantee
100% Money Back
Secure Payment
Privacy Protection