Do not worry about that if you are stuck in the Lean Six Sigma Black Belt ICBB exam difficulties, CertBus will assist you all your way through the Lean Six Sigma Black Belt ICBB IASSC Certified Lean Six Sigma Black Belt exam with the most update Lean Six Sigma Black Belt ICBB PDF and VCE dumps. CertBus exam ICBB preparation materials are the most comprehensive material, covering every key knowledge of ICBB IASSC Certified Lean Six Sigma Black Belt exam.
We CertBus has our own expert team. They selected and published the latest ICBB preparation materials from IASSC Official Exam-Center: http://www.certgod.com/ICBB.html
QUESTION NO:21
Which statement(s) are incorrect about Fractional Factorial Designs?
A. A Half Fractional Design for 5 factors has the same number of experimental runs as a Full
Factorial Design for 4 factors assuming no repeats or replicates or Center Points
B. Quarter Fractional experiments can exist for those with 4 factors
C. Resolution V design is desired while controlling costs of experimentation
D. Half Fractional experiments do not exist for those designs with only 2 factors
Answer: C
QUESTION NO:4
Control Charts were developed by Dr. Shewhart to track data over time. To detect Special Cause
variation the Control Charts use which of these?
A. Data shift analysis
B. Outlier analysis methods
C. Center Line and Control Limits
D. None of the above
Answer: C
QUESTION NO:17
If an experiment has 5 factors and no replicates for a 2-level Experimental Design with 16
experimental runs which statement is incorrect?
A. The Experimental Design is half-fractional
B. The Main Effects are confounded with only 4-way interactions
C. The Main Effects for the 5 factors are not aliased or confounded but the 2-way interactions are
confounded with the 3-way interactions
D. The experiment has 8 experimental runs with the first factor at the high level
Answer: C
QUESTION NO:15
Which statement(s) are correct about the Factorial Plot shown here? (Note: There are 3 correct
answers).
A. When the cutting speed increased from low to high level, the tool age increases
B. The coefficient of the metal hardness is positively related to the output of tool age
C. The coded coefficient is lower for cutting speed than the cutting angle related to the output of
tool age
D. These plots prove a statistically significance factor with 95% confidence
E. These plots are an example of interaction plots
Answer: A,B,C
QUESTION NO:18
Which statement(s) are correct about the Pareto Chart shown here for the DOE analysis? (Note:
There are 2 correct answers).
8
A. It is unknown from this graph how many factors were in the Experimental Design
B. The factors to keep in the mathematical model are E, D, DE, BD and B with an alpha risk equal
to 2.06
C. The effects to keep in the mathematical model are E, D, DE, BD and B with an alpha risk equal
to 0.05
D. The factors to keep in the mathematical model with a 5% alpha risk are BE, AB, A and AD
Answer: A,C
QUESTION NO:10
4
Following the completion of a LSS project the Belt not only creates a Control Plan he also
develops a _____________ so those involved in the process know what to do when the critical
metrics move out of spec.
A. Response Plan
B. Call List
C. Chain-of-Command
D. Defect Analysis Plan
Answer: A
QUESTION NO:25
Situations where standardized work needs to be incorporated include all of these except
_____________________.
A. Machines continually operating to reduce the labor cost per piece
B. Lack of a system to assure proper inventory levels at repair stations
C. Changeover instructions incomplete
D. Process flow for the same product assembly taking various cycle time for completion
Answer: A
QUESTION NO:22
If in an experiment all possible variable pairs sum to zero the design is Orthogonal.
A. True
B. False
Answer: A
QUESTION NO:20
Relative to a Design of Experiments the term ________________ refers to variables being a linear
combination of each other.
A. Mirror Image
B. Directly Parallel
C. Collinear
D. None of the above
Answer: C
QUESTION NO:26
The Lean toolbox includes all of these items except ________________.
11
A. Mistake Proofing
B. Visual Factory
C. Design of Experiments
D. Inventory Management
Answer: C
CertBus exam braindumps are pass guaranteed. We guarantee your pass for the ICBB exam successfully with our IASSC materials. CertBus IASSC Certified Lean Six Sigma Black Belt exam PDF and VCE are the latest and most accurate. We have the best IASSC in our team to make sure CertBus IASSC Certified Lean Six Sigma Black Belt exam questions and answers are the most valid. CertBus exam IASSC Certified Lean Six Sigma Black Belt exam dumps will help you to be the IASSC specialist, clear your ICBB exam and get the final success.
ICBB Latest questions and answers on Google Drive(100% Free Download): https://drive.google.com/file/d/0B_3QX8HGRR1mS0FXTWhWQ2l5dXc/view?usp=sharing
ICBB IASSC exam dumps (100% Pass Guaranteed) from CertBus: http://www.certgod.com/ICBB.html [100% Exam Pass Guaranteed]
Why select/choose CertBus?
Millions of interested professionals can touch the destination of success in exams by certgod.com. products which would be available, affordable, updated and of really best quality to overcome the difficulties of any course outlines. Questions and Answers material is updated in highly outclass manner on regular basis and material is released periodically and is available in testing centers with whom we are maintaining our relationship to get latest material.