How to pass ICBB exam easily with less time? CertBus provides the most valid ICBB exam preparation material to boost your success rate in IASSC Lean Six Sigma Black Belt ICBB IASSC Certified Lean Six Sigma Black Belt exam. If you are one of the successful candidates with CertBus ICBB PDF and VCEs, do not hesitate to share your reviews on our IASSC Lean Six Sigma Black Belt materials.
We CertBus has our own expert team. They selected and published the latest ICBB preparation materials from IASSC Official Exam-Center: http://www.certgod.com/ICBB.html
QUESTION NO:17
If an experiment has 5 factors and no replicates for a 2-level Experimental Design with 16
experimental runs which statement is incorrect?
A. The Experimental Design is half-fractional
B. The Main Effects are confounded with only 4-way interactions
C. The Main Effects for the 5 factors are not aliased or confounded but the 2-way interactions are
confounded with the 3-way interactions
D. The experiment has 8 experimental runs with the first factor at the high level
Answer: C
QUESTION NO:18
Which statement(s) are correct about the Pareto Chart shown here for the DOE analysis? (Note:
There are 2 correct answers).
8
A. It is unknown from this graph how many factors were in the Experimental Design
B. The factors to keep in the mathematical model are E, D, DE, BD and B with an alpha risk equal
to 2.06
C. The effects to keep in the mathematical model are E, D, DE, BD and B with an alpha risk equal
to 0.05
D. The factors to keep in the mathematical model with a 5% alpha risk are BE, AB, A and AD
Answer: A,C
QUESTION NO:12
Which of these elements are not included in Implementation plans?
A. Work breakdown structure
B. Risk management plans
C. Cost/Benefit ratios
D. Planned audits of work completion
Answer: C
QUESTION NO:15
Which statement(s) are correct about the Factorial Plot shown here? (Note: There are 3 correct
answers).
A. When the cutting speed increased from low to high level, the tool age increases
B. The coefficient of the metal hardness is positively related to the output of tool age
C. The coded coefficient is lower for cutting speed than the cutting angle related to the output of
tool age
D. These plots prove a statistically significance factor with 95% confidence
E. These plots are an example of interaction plots
Answer: A,B,C
QUESTION NO:13
5
Upon completion and validation of an improvement to a process a Belt and the Project Team
create a Control Plan that contains which of these?
A. Standard operating work description of the process change
B. Description of the monitoring system in place to assure continued compliance
C. Summary of the targeted critical metrics for process performance measurement
D. All of the above
Answer: D
QUESTION NO:4
Control Charts were developed by Dr. Shewhart to track data over time. To detect Special Cause
variation the Control Charts use which of these?
A. Data shift analysis
B. Outlier analysis methods
C. Center Line and Control Limits
D. None of the above
Answer: C
QUESTION NO:10
4
Following the completion of a LSS project the Belt not only creates a Control Plan he also
develops a _____________ so those involved in the process know what to do when the critical
metrics move out of spec.
A. Response Plan
B. Call List
C. Chain-of-Command
D. Defect Analysis Plan
Answer: A
QUESTION NO:11
The Control Limits width varies if the sample size varies for which type of chart?
A. P Charts
B. NP Charts
C. Xbar-R Charts
D. Time Series Charts
Answer: A
QUESTION NO:2
For her injection molding project a Belt needed to track the percentage of defectives of a particular
sample set so she used a ___________ to display the data?
A. Individual Chart
B. C Chart
C. Xbar Chart
D. P Chart
Answer: D
QUESTION NO:14
What conclusion is most correct about the Experimental Design shown here with the response in
the far right column?
A. No factor has enough statistical confidence greater than 95% to have an impact on the
response rate
B. Constant, Adv and Bev are the only factors statistically affecting the response rate with 95%
confidence or more
C. If the Adv is increased from the low level to the high level, the response rate increases
D. The response level is statistically concluded to only need the Adv and Bev factors set at the low
level to get the largest response rate
E. This design does not have enough experimental runs to conclude anything as evidenced by the
lack of P-values in the MINITABTM output
Answer: D
6
CertBus exam braindumps are pass guaranteed. We guarantee your pass for the ICBB exam successfully with our IASSC materials. CertBus IASSC Certified Lean Six Sigma Black Belt exam PDF and VCE are the latest and most accurate. We have the best IASSC in our team to make sure CertBus IASSC Certified Lean Six Sigma Black Belt exam questions and answers are the most valid. CertBus exam IASSC Certified Lean Six Sigma Black Belt exam dumps will help you to be the IASSC specialist, clear your ICBB exam and get the final success.
ICBB Latest questions and answers on Google Drive(100% Free Download): https://drive.google.com/file/d/0B_3QX8HGRR1mS0FXTWhWQ2l5dXc/view?usp=sharing
ICBB IASSC exam dumps (100% Pass Guaranteed) from CertBus: http://www.certgod.com/ICBB.html [100% Exam Pass Guaranteed]
Why select/choose CertBus?
Millions of interested professionals can touch the destination of success in exams by certgod.com. products which would be available, affordable, updated and of really best quality to overcome the difficulties of any course outlines. Questions and Answers material is updated in highly outclass manner on regular basis and material is released periodically and is available in testing centers with whom we are maintaining our relationship to get latest material.