Latest Update Free Version of Huawei HC-223-CHS Exam Study Guides in CertBus

Don’t worry about how to get yourself well prepared your HC-223-CHS exam! CertBus will work you out of your HC-223-CHS exam with the latest updated HC-223-CHS Huawei Certified Datacom Professional – Improving Enterprise Network Performance (HCDP-IENP) – CHS PDF and VCE dumps. CertBus provides the latest real Huawei HC-223-CHS exam preparation material, covering every aspect of HC-223-CHS exam curriculum.

We CertBus has our own expert team. They selected and published the latest HC-223-CHS preparation materials from Huawei Official Exam-Center: http://www.certgod.com/HC-223-CHS.html

QUESTION NO:19

A client has tried to update the firmware of an Ethernet adapter on a p5 590, however it

repeatedly fails. What is the most likely cause of this problem?

A. The adapter must be taken offline prior to the firmware update

B. The adapter must be assigned to the service partition prior to the firmware update

C. The system has not been rebooted since the adapter was added to the Logical Partition

D. The adapter must be dynamically removed from the Logical Partition prior to the firmware

update

Answer: A

QUESTION NO:110

A customer is installing a new POWER7 server with IBM i that needs redundant connections to the network. Which configuration provides both increased throughput as well as redundancy?

A. Multiple Ethernet lines with Showier routes.

B. Dual Ethernet lines with Virtual P addresses.

C. An aggregated Ethernet line to a supported switch.

D. Two Ethernet lines with MAXERAME(8996) and LINKSPEED(*MAX).

Correct Answer: C

QUESTION NO:1

An international company has a heterogeneous IBM storage environment with two IBM DS8700 systems

in a Metro Mirror relationship. They also have a virtualized environment with two SVC clusters in a Global

Mirror relationship. The storage administrator complains about the monitoring of copy services. Which

solution should the IBM storage specialist propose for this pain point?

A. System Storage Productivity Center

B. Tivoli Storage Productivity Center for Replication

C. Tivoli Storage Productivity Center for Disk

D. DS8000 Storage Manager

Correct Answer: B

QUESTION NO:33

Companycom is migrating from p670 systems running AIX 5.2 to p5 595 systems running AIX

5.3. They will be changing out only the system units. They will re-use the existing 61D drawers

and adapters with the new p5 595 systems. What compatibility issue must be considered?

A. APV features are not supported for some legacy POWER4 adapters

B. APV will require the most current maintenance level for AIX 5.2

C. APV features will require that legacy POWER4 adapters be updated with new microcode

D. The Virtual IO Server must run AIX 5.3 and the LPARs can run either AIX 5.2 or AIX 5.3

Answer: A

QUESTION NO:83

During the pre-installation planning of a customer\’s recently purchased IBM System Storage DS8700 the

port configuration, cabling, and disk layout were discussed. What other topic should be discussed in this

solution review?

A. LPAR capacity planning

B. logical volume configuration

C. data migration process

D. audit hosts for HBA worldwide port names

Correct Answer: C