Tens of thousands of competitors, pages of hard questions and unsatisfied exam preparation situations… Do not worried about all those annoying things! We, CertBus, help you with your HRCI SPHR The Professional in Human Resources (SPHR) exam. CertBus will assist you clear the SPHR exam with SPHR PDF and VCE questions. CertBus exam dumps are the most comprehensive ones.
We CertBus has our own expert team. They selected and published the latest SPHR preparation materials from HRCI Official Exam-Center: http://www.certgod.com/SPHR.html
QUESTION NO:156
A developer is writing an application that needs to support the HTC Thunderbolt and Motorola DROID
Pro devices. Using the Mobile Browser Simulator to preview the application, how can the developer
switch from one device to the other?
A. Launch a separate instance of Mobile Browser Simulator for each device.
B. Click the Switch label, then expand Android and select Motorola DROID Pro.
C. Click the drop down menu currently labeled HTC Thunderbolt, then expand Android and select
Motorola DROID Pro.
D. Click the Cordova API in the left hand side, expand the Device section and change the device simulator
from HTC Thunderbolt to MotorolaDROID Pro.
Correct Answer: C
QUESTION NO: 76
An organization is assigned the role of a Carrier and is defined to offer Less-Than Truckload (LTL)
shipment type of carrier service. Which carrier attributes define the LTL service in addition to Scac
and Service Code and Electronic Code?
A. Extended Delivery Mode, Transit Day Delays, and Host Code
B. PRO Number Length, Extended Ship Mode, and Fixed Transit Days
C. Extended Delivery Mode, Transit Day Delays, and Distance Per Day
D. PRO Number Length, Economic Shipping Parameters, and Fixed Transit Days
Answer: B
Explanation:
QUESTION NO: 84
Assume today\’s date is 10/10/2011. A Node has ONHAND inventory of 2 units of an item and is
expecting an additional inventory of 10 units on 10/15/2011. The node notification schedule is 7:00
AM every day and the node shift is 8 AM – 4 PM every day. The scheduling rule has “Line Ship
Complete” flag checked. If a customer places an order for 5 units of that item on 10/10/2011 at
3:00 PM, what is the expected date of shipment of the order?
A. 2 units on 10/10/2011 and 3 units on 10/15/2011
B. 2 units on 10/11/2011 and 3 units on 10/16/2011
C. 5 units on 10/15/2011
D. 5 units on 10/16/2011
Answer: C
Explanation:
QUESTION NO: 42
A company has DataPower XI52 physical appliances supporting its production environment. The
only optional feature that these appliances support is the Option for Application Optimization. The
company also uses DataPower Integration Appliance XI52 Virtual Edition for Non Production
Environment for its development and test environment. Development management is concerned
about their developers using features on the virtual appliance that are not licensed on the
production appliances. How can the solution implementer restrict the use of specific features on
the virtual appliances?
A. Download the correctly-featured firmware from IBM Fix Central. Upload the firmware to the
virtual appliance and reinitialize the appliance.
B. Download the correctly-featured firmware from IBM Fix Central. Upload the firmware to the
virtual appliance and perform a boot image.
C. Download the appropriate feature_disable_tool.scrypt4 tools from IBM Fix Central. Upload each
tool to the virtual appliance and perform aboot image.
D. Copy the store:///license.xml file from a production appliance to the virtual appliance to limit the
virtual appliance to the production appliance\’slicensed features.
Answer: C
Explanation:
QUESTION NO: 41
An administrator is trying to perform Live Partition Mobility (LPM) between physical systems managed by
the same HMC. The VIO Servers (VIOS) on each physical system are connected to the same SAN. The
client LPARs will use virtual SCSI (vSCSI) disks. The SCSI adapter slot numbers are between 11 and
20.Each client LPAR has a unique name. The network used by the client LPARs use Logical Host Ethernet
adapters (LHEA).The PowerVM Enterprise edition is being used. No EtherChannel has been configured.
Why are LPM activities failing?
A. This LHEA configuration is not supported for LPM.
B. The SCSI adapter slot numbers are too high.
C. Multiple MSP (mover service partitions) were configured.
D. The ssh keys have not been exchanged between the two VIO servers.
Correct Answer: A