[Latest Version] Free CertBus HP HP2-N38 PDF Download with 100% Pass Guarantee

Do not worry about your HP2-N38 exam preparation? Hand over your problems to CertBus in change of the HP2-N38 Advanced Project and Portfolio Management 9.x Upgrade certifications! CertBus provides the latest HP HP2-N38 exam preparation materials with PDF and VCEs. We CertBus guarantees you passing HP2-N38 exam for sure.

We CertBus has our own expert team. They selected and published the latest HP2-N38 preparation materials from HP Official Exam-Center: http://www.certgod.com/HP2-N38.html

QUESTION NO:133

A change to POWER7 server firmware is being planned on an HMC managed system. The current server firmware level is AL720_108_066, and the new server firmware level will be AL730_078_035.

What must the administrator take into consideration for this task?

A. A backup of critical FSP data needs to be scheduled.

B. Downtime needs to be scheduled as this will be a disruptive update.

C. The system ESP should have both network ports configured to the HMC to guard against HMC connection loss.

D. Ensure the “Apply Immediate” option is selected on the Submit Task panel so the update will be concurrent.

Correct Answer: B

QUESTION NO: 178

Which command is used before the initial database backup to establish the device class used for

database backups?

A. SET DBBACKUP

B. SET DBRECOVERY

C. SET DBDEVCLASS

D. SET DBBACKUPCLASS

Answer: B

QUESTION NO: 156

Which option limits the network data management protocol (NDMP) port range to the IBM Tivoli

Storage Manager server?

A. NDMPPortrange Max Min IPAddress

B. NDMPPortrange Min Max IPAddress

C. NDMPPortrange port_number_high port_number_low

D. NDMPPortrange port_number_low port_number_high

Answer: D

QUESTION NO: 42

A partition that uses an LHEA for network connectivity needs to be moved to another managed system.

The administrator has the LHEA configured in an Etherchannel with a virtual Ethernet adapter as the

backup adapter. When attempting to perform the migration using the Migration Wizard, it fails. What is

necessary for the migration to be successful?

A. The HMC command line interface needs to be used to perform the migration.

B. The migration must be initiated from the opertaing systems of the mobile partition.

C. The LHEA must be removed from the Etherchannel before the migration.

D. The destination server does not have an LHEA available for the migration.

Correct Answer: B

QUESTION NO:145

What is saved with the SAVSECDTA command?

A. User ProfilesGroup profilesObject owners

B. User ProfilesAuthority ListsPrivate Authorities

C. Authority ListsPrimary group profileObject owner assignments

D. Private AuthoritiesGroup ProfilesPrimary group profile assignments

Correct Answer: B