CertBus provides the most up to date and accurate preparing materials of the HP2-Z31 certification exam questions and answers , testing software, exam PDF and VCE files to help you prepare your HP2-Z31 Creating HP Software-defined Networks exam. What training you are looking for? Come to visit our site and choose CertBus online certification materials, you will get a quick and cost-efficient way to become a HP certified professional in IT industry.
We CertBus has our own expert team. They selected and published the latest HP2-Z31 preparation materials from HP Official Exam-Center: http://www.certgod.com/hp2-z31.html
QUESTION NO:10
A customer using an IBM System Storage DS8700 is facing performance problems. After the analysis by the
technical specialist, the diagnosis indicates that the cache hits may be improved by a cache upgrade. How
can the system be monitored in order to check the benefits of the cache upgrade?
A. using the “vmstat” command on the AIX servers connected via SAN to the DS8700 system
B. look at the IOPS using the DS8700
C. reading the performance reports via Tivoli Storage Productivity Center for Disk
D. generating reports using theTotalStorage Expert
Correct Answer: C
QUESTION NO:58
Which of the following statements is TRUE about the DOM API?
A. It defines memory management strategies.
B. It defines a standard way to create
QUESTION NO: 161
A VIO server requires redundancy on its Shared Ethernet Adapter (SEA). The SEA is backed by physical
adapter ent0 and virtual adapter ent2, ent0 and ent1 are the interfaces on a dual-port Ethernet adapter.
What network redundancy technique should be suggested?
A. ent1 should be used to set up a Network Interface Backup through \’smitty etherchannel1. The new
Etherchannel adapter should be used as the backing device for the SEA
B. ent1 should be used to set up Link Aggregation through \’smitty linkagg1. The new Link Aggregation
adapter should be used as the backing device for the SEA
C. Create a new SEA using another virtual Ethernet adapter on the VIO Server and assign ent1 as the
backing device. Assign this SEA to the clients and setup Link Aggregation on the clients.
D. Setup the SEA failover control channel to use the ent1 physical adapter as the backup control channel.
Correct Answer: A
QUESTION NO:45
Companycom has a p5 595 with no DVD configured on this server. How can they install the
Virtual IO Server code?
A. From the HMC
B. From a NFS mount
C. From a FTP server
D. From any CD or DVD drive on another server
Answer: A
QUESTION NO:7
Due to an application problem, management has requested the IPL of a partition running IBM i 7.1. The administrator initiates the IPL, and during the restart phase notices the IPL is running in manual mode even though the HMC partition settings indicate B NORMAL.
Why is the IPL running in manual mode?
A. The PWRDWNSYS command restart parameter is set to *MANUAL.
B. Manual is the default IPL mode when there is a console problem.
C. The QIPLTYPE system value is set to “Attended IPL, Console in debug mode”.
D. Manual is the default IPL mode when the previous system end indicator is abnormal.
Correct Answer: C