[PDF and VCE] Free CertBus EMC E22-128 VCE and PDF, Exam Materials Instant Download

This dump is 100% valid to pass EMC E22-128 exam. The only tips is please do not just memorize the questions and answers, you need to get through understanding of it because the question changed a little in the real exam. Follow the instructions in the CertBus E22-128 EMC legato cert networker 7 x administrator PDF and VCEs. All CertBus materials will help you pass your EMC exam successfully.

We CertBus has our own expert team. They selected and published the latest E22-128 preparation materials from EMC Official Exam-Center: http://www.certgod.com/E22-128.html

QUESTION NO:38

What are the minimum and maximum number of extent pools on an IBM System Storage DS8800 with 64

physical disks?

A. the minimum is 1 and the maximum is 8

B. the minimum is 2 and the maximum is 8

C. the minimum is 2 and the maximum is 16

D. the minimum is 1 and the maximum is 64

Correct Answer: A

QUESTION NO: 5

The WebSphere Rapid Deployment(WRD) tool is running in the automatic allocation mode. All of

the following enterprise applications will be deployed if the file types are placed below in WRD\’s

monitored directory EXCEPT.

A. An Enterprise Archive (EAR) file.

B. A Web module (WAR) file.

C. An EJB module JAR file.

D. A Resource Adapter Archive (RAR) file.

Answer: D

QUESTION NO:14

Which XML document is valid according to XML specifications?

A.

B.

C. C.

D.

Correct Answer: D

QUESTION NO:49

An administrator has a new, local, IP-based printer that is not communicating with the system. Ping is successful using the printer IP address and the printer name, and response time is acceptable. Users can print from Windows.

What should the administrator do next to troubleshoot the printer?

A. Verify that there is a route configured to the printer.

B. Use the TRACEROUTE command to find where the connection fails.

C. Verify that the printer address is correcting the HOSTS table on the system.

D. Display the printer device description to confirm that the correct port has been configured.

Correct Answer: D

QUESTION NO:9

A company has just purchased a new POWER7 server running IBM i 7.1 to replace an older system running V5R4M5. Due to a mistake by a programmer on the V5R4 system, data was accidently deleted. To recover, the administrator backs up the deleted data to virtual tape on the 7.1 server and attempts to restore it on the V5R4 server. The restore on the V5R4 server fails with a message stating the data was saved from a more recent release of the operating system.

Which option will solve this problem?

A. Save the data to physical media.

B. Set the target release parameter to V5R4M0 when saving the data.

C. ETP the virtual tape image catalog from the 7.1 server using binary mode.

D. Use the target release parameter *RECOVER and the access path parameter set to VSR4MO.

Correct Answer: B