[PDF and VCE] Free CertBus EMC E20-040 VCE and PDF, Exam Materials Instant Download

CertBus provides the most up to date and accurate preparing materials of the E20-040 certification exam questions and answers , testing software, exam PDF and VCE files to help you prepare your E20-040 EMC technology foundations exam. What training you are looking for? Come to visit our site and choose CertBus online certification materials, you will get a quick and cost-efficient way to become a EMC certified professional in IT industry.

We CertBus has our own expert team. They selected and published the latest E20-040 preparation materials from EMC Official Exam-Center: http://www.certgod.com/E20-040.html

QUESTION NO:8

XML is going to be used in a B2B application to exchange human-resources data between

multiple organizations. Each organization keeps its data in different forms, and produces different

reports. Which of the following issues would present the greatest challenges for the XML project?

A. Each corporation has its own non-XML record structure for this data.

B. Each corporation wants to display the records in a different layout in its intranet applications.

C. Some corporations will be sending a lot more data than others.

D. The corporations are not using the same operating systems or middleware platforms.

Answer: A

QUESTION NO:156

A developer is writing an application that needs to support the HTC Thunderbolt and Motorola DROID

Pro devices. Using the Mobile Browser Simulator to preview the application, how can the developer

switch from one device to the other?

A. Launch a separate instance of Mobile Browser Simulator for each device.

B. Click the Switch label, then expand Android and select Motorola DROID Pro.

C. Click the drop down menu currently labeled HTC Thunderbolt, then expand Android and select

Motorola DROID Pro.

D. Click the Cordova API in the left hand side, expand the Device section and change the device simulator

from HTC Thunderbolt to MotorolaDROID Pro.

Correct Answer: C

QUESTION NO: 74

A company wants to set up its business processes to monitor orders that have not been released

24 hours before their requested shipment date and, raise alerts for such orders. Assume that they

have configured the necessary monitor rule components, including milestones, date types, and

alert consolidation rules for the process type they are working with. Which monitoring rule type

should be defined to handle this scenario?

A. Has been in a status

B. Milestone has not reached before a date

C. Milestone has reached before a date

D. Milestone has not reached after a date

Answer: B

Explanation:

QUESTION NO:84

A customer has an existing IBM System Storage DS8700 2-way model with 8 mega packs of 300 GB disks

and 16 fibre ports. How many additional fibre ports and mega packs can be installed in the base frame?

A. 16fibre ports and 0 mega packs

B. 4fibre ports and 8 mega packs

C. 8fibre ports and 4 mega packs

D. 12fibre ports and 0 mega packs

Correct Answer: A

QUESTION NO:70

Companycom has successfully established their p5 LPAR environment on a POWER5 p5 590

running AIX 5.2. They are now ready to move to Virtual IO. What would be required to do Virtual

IO?

A. Apply APAR IY62262 to the current AIX 5.2 Maintenance level 04. Virtual IO Server is not

required.

B. Purchase Advanced POWER Virtualization software, upgrade to AIX 5.3 maintenance level 1

and apply APAR IY60349. Virtual IO Server is not required.

C. Verify that there are enough resources to add a Virtual IO Server, upgrade to AIX 5.3 with

APAR IY60349, create a Virtual IO Server after applying APAR IY62262.

D. Verify that there are enough resources to add a Virtual IO Server, create a Virtual IO Server

and apply APAR IY62262, verify that the system is at AIX 5.2 with Maintenance level 04.

Answer: C