How to pass 1D0-430 exam 100% without any difficulties? We, CertBus, provide the latest exam preparation material for the CIW 1D0-430 CIW Application Developer exam. Successful candidates share their experience about their 1D0-430 exam and the 1D0-430 exam preparation with CertBus exam questions and answerss. CertBus provides the new VCE and PDF dumps for the latest 1D0-430 exam. We ensure your 1D0-430 CIW Application Developer exam pass.
We CertBus has our own expert team. They selected and published the latest 1D0-430 preparation materials from CIW Official Exam-Center: http://www.certgod.com/1D0-430.html
QUESTION NO: 18
The Item Bedroom Set has components Bed Set, Dresser Set and Entertainment Set. The Bed
Set, Dresser Set and Entertainment Set are individual bundles in that Bedroom Set. Which Item
Type does this Bedroom Set represent in IBM Sterling Selling and Fulfillment Suite?
A. Bundle
B. Package
C. Logical Kit
D. Physical Kit
E. Dynamic Physical Kit
Answer: A
Explanation:
QUESTION NO: 68
A rule is configured such that ITEM1 cannot be scheduled until ITEM2 has completed the
schedule transaction. However, another rule prevents ITEM2 from scheduling until ITEM1 has
been scheduled. This type of dependency is detected by the transaction dependency logic and an
exception is thrown along with a list of the dependencies that caused this. Which type of
dependency defines this scenario?
A. Cross dependencies
B. Circular dependencies
C. Transactional dependencies
D. Inter-transaction dependencies
Answer: B
Explanation:
QUESTION NO:149
A developer needs to call a Java class that is packaged in a JAR file from an adapter. Where should this
JAR file be placed in the project\’s folder structure?
A. server/java
B. server/lib
C. adapters/java
D. adapters/lib
Correct Answer: B
QUESTION NO:34
A customer RFP requires installation of an open system SAN and migration of 40 TB currently residing on
ten UNIX servers (on internal server disk). The Service Level Agreement (SLA) requires no more than five
minutes per week of planned downtime for backup. Which IBM System Storage solution is the most cost
effective?
A. an IBM System Storage DS8700 with LTO tape drive
B. an IBM System Storage DS8700 with FlashCopy Manager
C. an IBM XIV Storage System
D. an IBM XIV Storage System with SAN Volume Controller
Correct Answer: C
QUESTION NO:162
A Worklight application does not need to connect to a server on startup. However, when previewing the
application on the device emulator, it is throwing a server connection error on start up. What is the
consequence if the connection error is resolved using the WL.Client.init({connectOnStartup:false}) API to
disable the connection to the server on application startup?
A. The application will not be able to subsequently connect to the server.
B. Server features other than the Remote Disable or Direct Update will be disabled.
C.
Any server features the application uses will only be available when it connects to the server.
D.
There will be no potential consequences as the runtime will safely disable server connectivity errors.
Correct Answer: C