[Latest Version] Free CertBus Cisco 642-891 PDF Download with 100% Pass Guarantee

There is no need to worry when you are suffering the difficult time in the 642-891 exam preparation, CertBus will assist you to pass the 642-891 exam with latest update 642-891 Composite Exam PDF and VCE dumps. CertBus has the most comprehensive Cisco exam preparation materials, covering each and every aspect of 642-891 Composite Exam exam curriculum. We ensure you 100% success in 642-891 exam.

We CertBus has our own expert team. They selected and published the latest 642-891 preparation materials from Cisco Official Exam-Center: http://www.certgod.com/642-891.html

QUESTION NO: 39

A system administrator fedrated a custom profile to the deployment manager. The system

administrator then created a new server (server1) on the fedrated node. How should the system

administrator verify that the server was successfully created?

A. Use the snoop servlet

B. Run the installation Verification proram

C. View the addNode.lo file of the node agent.

D. View SystemOut.log file of the deployment manager.

Answer: D

QUESTION NO:141

An administrator needs to establish a long-term system performance monitoring process. The administrator needs to show long-term trends in CPU and disk capacity use, with the limits for the processor model on charts.

Which tool should the administrator use to support this requirement?

A. IBM i Performance Explorer (PEX)

B. IBM System Director Navigator for i

C. System i Navigator Management Central

D. IBM Performance Management for Power Systems

Correct Answer: D

QUESTION NO:99

Where in IBM i Navigator can suggestions for improved database performance generated by the system be viewed and implemented?

A. Index Advisor

B. Health Center

C. Database Navigator

D. SQL Plan Cache Event Monitors

Correct Answer: A

QUESTION NO:80

An administrator is setting up a new Power 720 server with LAN Console for the first time. The connection will use a dual port Ethernet card located in a PCIe card slot.

After the Operations Console software is installed, the PC is cabled to the server and TCP/IP connections are configured, the server is powered on.

What must the administrator do to complete the LAN Console configuration process?

A. IPL the system to B Manual mode and configure the console device.

B. Move the console and server network cables to the primary network.

C. IPL the system in normal mode, start DST and sign in with 1111111.

D. Set the console adapter location using the control panel functions.

Correct Answer: D

QUESTION NO: 105

A customer needs to connect an application server to a third party vendor\’s EIS. The customer

asks the consultant about the functionalities that should be available with a JCA Resource

Adapter that has been supplied by the EIS vendor. The consultant responds that all of the

functionalities should be available EXCEPT for the one stating that it

A. Provide connectivity between J2EE components such as an application server or an

application client and an EIS

B. Collaborates with the application server to provide contract services such as connection

pooling transaction management caching and messaging

C. Implements the Common Client interface (CCI) for EIS access

D. Implements the standard Service Provider Interface

Answer: B