[Newest Version] Free CertBus Cisco 650-316 PDF and Exam Questions Download 100% Pass Exam

Don’t worry about how to get yourself well prepared your 650-316 exam! CertBus will work you out of your 650-316 exam with the latest updated 650-316 SP Video Digital Media Phase II PDF and VCE dumps. CertBus provides the latest real Cisco 650-316 exam preparation material, covering every aspect of 650-316 exam curriculum.

We CertBus has our own expert team. They selected and published the latest 650-316 preparation materials from Cisco Official Exam-Center: http://www.certgod.com/650-316.html

QUESTION NO:23

A customer has a primary (A) and a secondary (B) local data center. Now they plan to setup a third data

center (C) approximately 700 kilometers away. All centers use DS8000. They need to have mission critical

data available and consistent in all three sites. IBM is proposing a Metro Global Mirror solution. Which of

the following licensed functions are required in the secondary (B) local data center machine?.

A. Metro Global Mirror license, Metro Mirror license, Volume Copy license

B. Metro Global Mirror license, Metro Mirror license, Global Mirror license

C. Metro Global Mirror license, Global Mirror license

D. Metro Mirror license, Global Mirror license,FlashCopy license

Correct Answer: B

QUESTION NO: 182

In an environment with disk and tape storage pools in the primary pool hierarchy, data should be

migrated automatically when the disk storage pool gets full. What has to be adjusted in the

definitions of the primary storage pool to avoid an out-of-space condition during backup?

A. Set thelowmig threshold to a value below 10%.

B. Run a daily administrative schedule to set thehighmig threshold to 100%.

C. Adjust the number of migration tasks to the number of tape drives available and free for the

migration process.

D. Prevent migration during the backup task by specifying the valuenomig=backup in the storage

pool definitions.

Answer: C

QUESTION NO:134

An administrator notices the time stamp of service processor-related messages are significantly different

from other time stamps from events known to have occurred at the same time.

The system is HMC managed.

The HMC time zone shows the correct local time

IBM i shows the correct local time.

Where can the service processor time setting be verified?

A. In the QUTCOFFSET system value

B. In the ASMI date and time settings

C. In the Universal Time setting in System Service Tools

D. In the date and time setting for the managed system on the HMC Correct Answer: B

QUESTION NO:22

Companycom is purchasing a p5 590 which was configured with 60 Amp line cords. They have

just indicated that their large datacenter is already wired for 100 Amp power circuits in the

location where the server will be installed. What would be the recommended action?

A. Use the 60 Amp line cords

B. Change the 100 Amp connector to a 60 Amp circuit

C. Submit an RPQ to order the p5 590 with 100 Amp power cords

D. Change the configuration and order the p5 590 with the 100 Amp power cords

Answer: D

QUESTION NO:127

A developer is writing a Worklight mobile application to run on Android and iOS platforms. The developer is

using the Apache Cordova device.platform API in the code to identify the device\’s platform type. Which

additional step, if any, should the developer perform before building and deploying the application to

successfully use the Apache Cordova API?

A. Set the element to true in the application\’s descriptor file to indicate the use of Cordova.

B. Copy the cordova.jar library file to the project\’s server folder to make it available to the application at

run-time.

C. No additional step is required since the Cordova framework is automatically added into Worklight iOS

and Android projects.

D. Add a element to the application\’s main HTML file to include the cordova.js JavaScript file that

defines the API functions.

Correct Answer: C