Which certification is the most popular and worthy to get? No doubt the 156-215.75 Check Point Certified Security Administrator exam is a worth challenging task but you should take among all the IT certifications . CertBus is providing the latest version of 156-215.75 PDF and VCE dumps now. Comprehensive understanding on 156-215.75 Check Point Certified Security Administrator exam syllabus through CertBus 100% pass guarantee of the success on your 156-215.75 Check Point Certified Security Administrator exam taking.

We CertBus has our own expert team. They selected and published the latest 156-215.75 preparation materials from CheckPoint Official Exam-Center: http://www.certgod.com/156-215-75.html

QUESTION NO:57

An administrator is creating an IBM i 6.1 guest partition on a Power 720 with no expansion units. The host partition is an IBM i 7.1 partition. The system has only one internal DVD, located in the CEO, which is allocated to the host partition.

The administrator has configured the partition profile, the client and server vSOSI adapter pair, a network server description and 12 storage spaces. There is no additional optical media device to start the D-mode IPL for this guest partition.

What is the fastest way for the administrator to complete the IBM i 6.1 installation?

A. Use the existing DVD device that is allocated to the host partition.

B. Reallocate the DVD device from the host partition to the guest partition.

C. Configure another vSCSI adapter pair in order to access the existing DVD device.

D. Convert the 6.1 DVD5 to .iso images, create a virtual optical device and load the iso images to it.

Correct Answer: A

QUESTION NO: 154

How can SMT be temporarily disabled at the next boot of a Linux LPAR?

A. Update/proc/cpuinfo special device file.

B. Use the ppc64_cpu command.

C. Set linux smt-enabled=off at the boot: prompt.

D. Use the smtclt command.

Correct Answer: C

QUESTION NO:40

An administrator has successfully completed installing the current cumulative PTF package, most recent Technology Refresh level, plus multiple group PTEs.

Due to time constraints a full system backup cannot be completed, but there is time for a subset of a full system save.

Which type of save will capture the changes made by the PTF and Technology Level installation?

A. Save System (SAVSYS)

B. Save System Data Only (SAVE menu option 22)

C. Save IBM product data – SAV OBJ((`/QIBM/ProdData\’)(7QOpenSys/QIBM/ProdData\’))

D. Save IBM Libraries, Save Configuration and Security Data – SAVLIB *IBM SAVCFG and SAVSECDTA

Correct Answer: B

QUESTION NO:108

An administrator needs to write a tool in CL to reorganize all database file members with more than 10% deleted records or more than 5GB of deleted record space.

The tool will need to generate and read a list of all:

-Libraries in the system

-Files in each library

Members in each file

What is the minimum number of programs that need to be created for this tool?

A.

1

B.

2

C.

3

D.

4

Correct Answer: A

QUESTION NO:4

An administrator needs to restore a physical file DATALIB/SMALLFILE from a Save 21 backup of library DATALIB. DATALIB has several hundred large database files plus other objects.

The administrator has the job log and output from the last full save of DATALIB. What should the administrator do to restore SMALLFILE in the shortest time?

A. Run the RST command for object “/QSYS.LIB/DATALIB.LIB/SMALLFILE.FILE”

B. Delete SMALLFILE, run RSTLIB specifying *NEW objects, and specify library DATALIB as the starting library.

C. Run RSTLIB for library DATALIB specifying the position parameter for SMALLFILE in library DATALIB from the output of the save.

D. Run RSTOBJ for DATALIB/SMALLFILE specifying the position and sequence number for SMALLFILE

in library DATALIB from the output of the save. Correct Answer: D