One of my colleague recommend me that CertBus ACT-VERBAL dumps are effective and helpful. Thank goodness I followed up with him and choose CertBus as my assistance on my ACT-VERBAL ACT-Verbal certification exam! I passed my Admission Test ACT-VERBAL exam very easily. I was lucky, all my questions in the exams were from my Admission Test ACT-VERBAL dumps.
We CertBus has our own expert team. They selected and published the latest ACT-VERBAL preparation materials from Admission Test Official Exam-Center: http://www.certgod.com/ACT-Verbal.html
QUESTION NO: 22
An architect is desiging a new virtualized POWER7 system. The system will have a number of AIX and
Linux LPARs and will be deployed with a logical memory block size of 16MB.Which of the following could
be used to determine the amount of memory used by the Hypervisor?
A. System Planning Tool.
B. System Configurator.
C. Facts and Features Guide.
D. LPAR Validation Tool.
Correct Answer: A
QUESTION NO: 144
An administrator is planning to configure two new Power Systems servers for Live Partition Mobility (LPM).
Each server will be connected to a separate HMC. What is required to achieve this in addition to those
requirements needed for LPM with a common HMC?
A. An RMC connection between each VIO partitionSSL key exchange between each VIO partition and all
FSPs
B. An RMC connection between both HMCsSSH key exchange between all HMCs and FSPs
C. A common IP network between all VIO partitionsRMC key exchange between both HMCs and all VIO
partitions
D. A common IP network between both HMCs SSH key exchange between both HMCs
Correct Answer: D
QUESTION NO:78
A customer has a primary (A) and a secondary (B) local data center. Now they plan to setup a third data
center (C) approximately 700 kilometers away. All centers use DS8000. They need to have mission critical
data available and consistent in all three sites. IBM is proposing a Metro Global Mirror solution. Which of
the following licensed functions are required in the secondary (B) local data center machine?.
A. Metro Global Mirror license, Metro Mirror license, Volume Copy license
B. Metro Global Mirror license, Metro Mirror license, Global Mirror license
C. Metro Global Mirror license, Global Mirror license
D. Metro Mirror license, Global Mirror license,FlashCopy license
Correct Answer: B
QUESTION NO:169
An application needs to log into an existing backend with the fields username, password, pin code and
account number. Which set of actions does the developer need to take in addition to creating a custom
Java Authenticator?
A.
– Use the auth.js as is to display the login form- Configure the authenticationConfig.xml- Create client-
side authentication components
B.
– Configure the authenticationConfig.xml- Configure the worklight.properties- Create client-side
authentication components
C. – Configure the authenticationConfig.xml- Create a custom Java Login Module- Create client-side
authentication components
D. – Configure the authenticationConfig.xml- Create a custom Java Login Module- Use the auth.js as is to
display the login form
Correct Answer: C
QUESTION NO: 4
A customer places an order of amount $100. As per their business rules, if the payment method is
credit card the retailer has to authorize the credit card by contacting the payment gateway for the
complete order amount before the order can be scheduled. Which execution step needs to be
completed for the payments on the order to be authorized and the details stored against the
order?
A. The managePaymentTerms API needs to be invoked with the appropriate order and payment
information in the input.
B. The executePaymentTransactions API needs to be invoked with the appropriate order and
payment information in the input.
C. The Payment Collection, Payment Execution and Payment Collection transactions should be
executed in that sequence for the order.
D. The payment status on the order has to be manually changed to UTHORIZED?from the
Sterling Selling and Fulfillment Foundation console.
Answer: C
Explanation: